{"title":"Project","description":null,"products":[{"product_id":"microsoft-project-2010-professional-retail-5-pc","title":"Microsoft Project 2010 Professional Retail [5 PC]","description":"\u003ch2\u003eMicrosoft Project 2010 Professional for Multi-Project Portfolios\u003c\/h2\u003e\n\u003cp\u003e\u003ca href=\"\/products\/microsoft-project-2010-professional-retail-5-pc\"\u003eMicrosoft Project 2010 Professional\u003c\/a\u003e is the desktop project and portfolio management application for organisations that run multiple projects in parallel, share resources across teams, and need tighter integration with SharePoint 2010 and \u003ca href=\"\/products\/microsoft-project-2019-professional-retail-2-pc\"\u003eProject 2019 Professional\u003c\/a\u003e Server. The Professional edition extends the Standard build with resource pools, business intelligence reporting, and the collaboration paths that a centralised PMO requires. It is delivered as a one-time, perpetual license, which means there is no recurring subscription to manage for the desktop application itself. Activation is straightforward — run the \u003ca href=\"\/products\/microsoft-project-2019-professional-retail-5-pc\"\u003eProject 2019 Professional\u003c\/a\u003e 2010 Professional installer on each Windows PC, paste the 25-character product key when prompted, and the application is ready for Gantt planning, resource pool coordination, and SharePoint task sync in a few minutes, with the same product key remaining valid for the lifetime of the install. Every key is sourced directly from Microsoft authorized channels and delivered to your account dashboard the moment your payment clears, so activation goes through cleanly without invalid-key errors and the same key reactivates after a clean reinstall or hardware change. Standard covers the core Gantt, scheduling, and reporting tools; Professional adds the resource pool, Team Planner, and SharePoint task list sync for multi-project coordination, so double-check the edition on the title before checkout. 📋 📅 ⏱️\u003c\/p\u003e\n\n\u003ch2\u003eWhat Is Included and How Activation Works\u003c\/h2\u003e\n\u003cp\u003eYour purchase of the 5PC Retail Online license includes one Microsoft \u003ca href=\"\/products\/microsoft-project-2024-professional-bind-1-pc\"\u003eProject 2024 Professional\u003c\/a\u003e 2010 Professional product key that activates the application on up to five Windows PCs. The key is bound to the installation, not to a Microsoft account, so it can be transferred to a different PC if hardware is replaced. The same key can be used to reactivate \u003ca href=\"\/products\/microsoft-project-2019-standard-retail-5-pc\"\u003eProject 2019 Standard\u003c\/a\u003e 2010 Professional on the same PCs after a clean reinstall of the operating system.\u003c\/p\u003e\n\u003cp\u003eTo activate, run the Microsoft \u003ca href=\"\/products\/microsoft-project-2024-standard-bind-1-pc\"\u003eProject 2024 Standard\u003c\/a\u003e 2010 Professional installer on each Windows PC, enter the 25-character product key when prompted, and complete the online activation. An internet connection is required only during the activation step and for downloading optional updates. Once activated, the application runs entirely offline. There are no monthly usage fees, no auto-renewals, and no version lock-in.\u003c\/p\u003e\n\n\u003ch2\u003eKey Features and Capabilities\u003c\/h2\u003e\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eGantt charts and built-in templates\u003c\/strong\u003e — pre-populated Gantt views, timelines, and customisable templates give you a working baseline within minutes; import task data from Excel, Word, Outlook, or PowerPoint.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eResource Manager and resource pools\u003c\/strong\u003e — centralise people, equipment, and material resources across multiple .mpp files; identify over-allocations and resolve them with built-in leveling tools.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTask Path highlighting\u003c\/strong\u003e — see the chain of predecessors and successors for any selected task; the critical path is colour-coded so the at-risk portion of the schedule is obvious.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTeam Planner view\u003c\/strong\u003e — a swim-lane view that arranges work by team member, surfaces scheduling conflicts side by side, and lets the project manager drag and drop tasks to rebalance the team.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTimesheets and status updates\u003c\/strong\u003e — capture project and non-project time for payroll, billing, and capacity reporting; integrate timesheet flow with Project Web App via SharePoint 2010.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eInactive tasks\u003c\/strong\u003e — toggle tasks on or off to model what-if scenarios, alternative delivery paths, or proposed scope changes without disturbing the live baseline.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eSharePoint 2010 task list sync\u003c\/strong\u003e — publish project tasks to a SharePoint site so team members can read and update status from a browser, even if they do not have Project installed.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eVisio 2010 and Visio Services integration\u003c\/strong\u003e — generate Visio timeline, network, and process diagrams directly from project data; publish data-connected diagrams to SharePoint for browser-based viewing.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eReporting with Excel Services and BI\u003c\/strong\u003e — export to Excel, build pivot reports, and surface burndown and earned value analytics through SharePoint and Excel Services.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eCustom fields, outline codes, and formulas\u003c\/strong\u003e — extend the data model to track issue severity, risk score, phase gate approvals, or any business-specific dimension.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eWho This Edition Is For\u003c\/h2\u003e\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eProject management offices (PMOs)\u003c\/strong\u003e running a portfolio of related projects that share resources and need consolidated status reporting through SharePoint or Project Server.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eEngineering and construction project managers\u003c\/strong\u003e who need the resource pool workflow to coordinate contractors, internal staff, and equipment across multiple job sites.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eConsulting and professional services firms\u003c\/strong\u003e that need timesheet capture, billing rate tables, and the ability to model inactive tasks for proposed engagements.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eOrganisations standardised on Windows 7 and SharePoint 2010\u003c\/strong\u003e that want a perpetual project management application without a Microsoft 365 dependency.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eStandard vs Professional: What Project Adds\u003c\/h2\u003e\n\u003cp\u003eProject Standard is the core project management application: Gantt charts, scheduling, dependencies, milestones, calendars, and built-in reporting. Project Professional adds the features that an organisation needs when it has more than one project running at a time, when it shares resources across teams, or when it wants a tighter collaboration path with SharePoint. The Resource Manager view and the resource pool workflow are the most visible additions, because they let a project manager coordinate shared people and equipment across multiple .mpp files. Team Planner is another Professional-only view, arranging work by team member so that conflicts and over-allocations are easy to see at a glance. SharePoint task list sync, the Office Add-in platform with read\/write access to project data, and the additional Office integration paths round out the collaboration story that the Standard edition does not provide.\u003c\/p\u003e\n\u003cp\u003eFor a single user running a single project, Standard is the right fit and the lower-cost option. For a PMO, a portfolio of related projects, or any team that shares resources across projects, Professional is the typical choice. The perpetual license model means the chosen edition stays available on each activated PC for the lifetime of the installation, with no monthly fees to manage and no auto-renewals to track.\u003c\/p\u003e\n\n\u003ch2\u003eCommon Workflows and Use Cases\u003c\/h2\u003e\n\u003cp\u003e\u003cstrong\u003eSoftware rollout planning.\u003c\/strong\u003e Project managers can use the built-in software rollout template, customise it for the specific release, and assign tasks to engineers, QA, and release managers. The Resource Manager view surfaces overallocation when two engineers are double-booked across the release and the next quarter's maintenance work, and the built-in leveling tool resolves the conflict by shifting the maintenance window. Status updates flow back from team members through the SharePoint task list, so the steering committee can see burndown and earned value analytics through the exported Excel and Power BI reports.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eConstruction and engineering coordination.\u003c\/strong\u003e For a multi-phase construction project, the resource pool holds the contractors, the equipment, and the shared on-site staff. The Team Planner view arranges the schedule by person, so the project manager can see who is on site, who is on the road, and who is overallocated for the week. Task Path highlighting surfaces the critical path, which is essential when a delay in the foundation phase cascades into every subsequent trade. Reporting is exported to PowerPoint for the weekly client update and to Excel for the cost reconciliation that the finance team runs at the end of the month.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eConsulting engagement management.\u003c\/strong\u003e A consulting firm can use a single .mpp file per engagement, with a shared resource pool that holds the partners, the senior consultants, and the staff. The SharePoint task list integration captures timesheets and status updates directly from team members, and the rate tables calculate the engagement margin as work is logged. Inactive tasks let the firm model what-if scenarios for the next quarter's pipeline without disturbing the live engagements.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eMarketing and event delivery.\u003c\/strong\u003e A marketing team running a campaign or an event delivery team running a conference can keep the master Gantt chart in Project and use the timeline view above the Gantt chart to present a clean executive roadmap to stakeholders. The Kanban-style board view (in \u003ca href=\"\/products\/microsoft-project-2021-professional-retail-2-pc\"\u003eProject 2021 Professional\u003c\/a\u003e and later) is the right tool for the daily standup, and the SharePoint task list sync keeps every contributor aligned without requiring them to open Project themselves.\u003c\/p\u003e\n\n\u003ch2\u003eSystem Requirements\u003c\/h2\u003e\n\u003ctable\u003e\n  \u003cthead\u003e\n    \u003ctr\u003e\n\u003cth\u003eComponent\u003c\/th\u003e\n\u003cth\u003eMinimum\u003c\/th\u003e\n\u003cth\u003eRecommended\u003c\/th\u003e\n\u003c\/tr\u003e\n  \u003c\/thead\u003e\n  \u003ctbody\u003e\n    \u003ctr\u003e\n\u003ctd\u003eOperating system\u003c\/td\u003e\n\u003ctd\u003eWindows XP SP3 (32-bit), Windows Vista SP1, Windows 7, Windows Server 2003 R2 with MSXML 6.0, Windows Server 2008 or later (32-bit or 64-bit)\u003c\/td\u003e\n\u003ctd\u003eWindows 7 SP1 or Windows Server 2008 R2 (64-bit)\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eProcessor\u003c\/td\u003e\n\u003ctd\u003e700 MHz or faster x86 or x64 with SSE2\u003c\/td\u003e\n\u003ctd\u003e1.6 GHz or faster, dual-core\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eMemory (RAM)\u003c\/td\u003e\n\u003ctd\u003e512 MB (32-bit) or 1 GB (64-bit)\u003c\/td\u003e\n\u003ctd\u003e2 GB or more\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eHard disk space\u003c\/td\u003e\n\u003ctd\u003e2.0 GB available\u003c\/td\u003e\n\u003ctd\u003e4 GB or more for project files and backups\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eDisplay\u003c\/td\u003e\n\u003ctd\u003e1024 × 768 or higher resolution\u003c\/td\u003e\n\u003ctd\u003e1280 × 800 or higher with DirectX 9.0c compatible graphics\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eInternet\u003c\/td\u003e\n\u003ctd\u003eRequired for activation, optional for product use\u003c\/td\u003e\n\u003ctd\u003eBroadband for SharePoint sync and updates\u003c\/td\u003e\n\u003c\/tr\u003e\n  \u003c\/tbody\u003e\n\u003c\/table\u003e\n\n\u003ch2\u003eActivation and Licensing Notes\u003c\/h2\u003e\n\u003cp\u003eThe 5PC Retail Online key is a perpetual license for Microsoft Project 2010 Professional. It activates on five Windows PCs and remains valid for the lifetime of the installation on each device. The key can be reused on the same PCs after a reinstall. It is not tied to a Microsoft account, so there is no online profile dependency. The license is single-edition; Project 2010 Professional and Project 2010 Standard cannot be installed on the same PC using the same key.\u003c\/p\u003e\n\u003cp\u003eProject 2010 Professional supports both 32-bit and 64-bit editions of Windows. For the resource pool and SharePoint workflow scenarios that the Professional edition is designed for, a 64-bit install with at least 4 GB of RAM is recommended. If you intend to connect to Project Server 2010 or to publish tasks to SharePoint 2010, the relevant server infrastructure must already be available on your network.\u003c\/p\u003e\n\n\u003ch2\u003eGet Started With Microsoft Project 2010 Professional\u003c\/h2\u003e\n\u003cp\u003eDownload the Project 2010 Professional installer from the official Microsoft download center, enter your 5PC product key when prompted, and follow the activation wizard. A quick start guide, the full Project 2010 reference, and the SharePoint sync admin guide are available on the Microsoft Learn archive to help your team standardise on the tool. With a perpetual license, the project management capability remains available on each activated PC for as long as the hardware and the Windows installation are in use.\u003c\/p\u003e\u003ch2\u003eMicrosoft Project 2010 Professional Alternatives\u003c\/h2\u003e\n\u003cp\u003eThree credible alternatives cover most project management workloads.\u003c\/p\u003e\n\u003ch3\u003eMicrosoft Project Online (subscription)\u003c\/h3\u003e\u003cp\u003eCloud-based project management with Power BI reporting, resource engagement, and roadmap features. Best fit for organisations already on the Microsoft 365 platform.\u003c\/p\u003e\u003ch3\u003eAsana\u003c\/h3\u003e\u003cp\u003eModern work management platform with portfolios, goals, and timeline views. Strong fit for cross-functional teams that need both project and task tracking.\u003c\/p\u003e\u003ch3\u003eMonday.com or ClickUp\u003c\/h3\u003e\u003cp\u003eHighly configurable work management platforms with Gantt chart views, automations, and integrations. Best fit for teams that want a single tool for projects, tasks, and CRM-style work.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHow to choose:\u003c\/strong\u003e Stay on Project desktop if you need deep resource management, enterprise project types, and integration with the rest of the Microsoft platform. Choose Project Online for cloud access and Power BI reporting. Choose Asana or Monday if you need a flexible work management tool that goes beyond project scheduling.\u003c\/p\u003e\n\n\u003ch2\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eDoes this license include future upgrades to Project 2013 or Project 2016?\u003c\/summary\u003e\n  \u003cp\u003eNo. The Retail Online key is for Project 2010 Professional specifically. To upgrade, a new license for the newer version must be purchased. The Project 2010 file format (.mpp) remains compatible with \u003ca href=\"\/products\/microsoft-project-2013-professional-retail-5-pc\"\u003eProject 2013 Professional\u003c\/a\u003e 2016, 2019, and later editions for read access, but a separate license is required to use those versions.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eCan the same key be split across five separate users in different offices?\u003c\/summary\u003e\n  \u003cp\u003eYes. The 5PC license is counted per device, not per user. As long as the total number of activated PCs does not exceed five, the key can be used across multiple users, sites, and countries.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eWhat happens if I need to reinstall Project on a PC that is still counted among the five?\u003c\/summary\u003e\n  \u003cp\u003eYou can deactivate the existing installation from inside Project (File \u0026gt; Account \u0026gt; Deactivate) or uninstall the application, then reinstall and reactivate using the same key. The activation count is decremented automatically when the deactivation is registered online.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eDoes Project 2010 Professional run on Windows 10 or Windows 11?\u003c\/summary\u003e\n  \u003cp\u003eProject 2010 is not on the official Windows 10 or Windows 11 compatibility list from Microsoft. It will install and run on Windows 10 in compatibility mode on most hardware, but the safest deployment is on Windows 7 SP1 or Windows Server 2008 R2. For new Windows 10 or Windows 11 installations, \u003ca href=\"\/products\/microsoft-project-2016-professional-retail-5-pc\"\u003eProject 2016 Professional\u003c\/a\u003e or later is recommended.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eIs Skype for Business or Microsoft Teams integration included?\u003c\/summary\u003e\n  \u003cp\u003eProject 2010 Professional integrates with SharePoint 2010 task lists and can be paired with Communicator 2010 or Lync 2010 for presence. Native Microsoft Teams integration is not available because Teams post-dates Project 2010 by several years.\u003c\/p\u003e\n\u003c\/details\u003e\n\n","brand":"Microsoft","offers":[{"title":"Default Title","offer_id":59850907877457,"sku":"MS-043-MICROSOFT-PROJECT-2010-PROFESSIONAL-RETA","price":14.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1059\/0191\/6241\/files\/microsoft-project-2010-professional-retail-5-pc.webp?v=1784725514"},{"product_id":"microsoft-project-2013-professional-retail-5-pc","title":"Microsoft Project 2013 Professional Retail [5 PC]","description":"\u003ch2\u003eMicrosoft Project 2013 Professional for Modern Project Portfolios\u003c\/h2\u003e\n\u003cp\u003e\u003ca href=\"\/products\/microsoft-project-2013-professional-retail-5-pc\"\u003eMicrosoft Project 2013 Professional\u003c\/a\u003e is the project management edition that pairs the familiar Office 2013 user experience with the deeper project, resource, and collaboration capabilities that professional project managers depend on. It introduces Touch Mode for tablet users, a redesigned start experience, real-time presence through Lync 2013, and bidirectional SharePoint 2013 task list sync. For organisations moving from \u003ca href=\"\/products\/microsoft-project-2010-professional-retail-5-pc\"\u003eProject 2010 Professional\u003c\/a\u003e the 2013 release delivers a measurable productivity gain without requiring a full Microsoft 365 migration. Activation is a clean one-time step on each Windows PC, with no subscription portal to manage and no monthly usage fees — the Office 2013 user experience, resource pool, Lync 2013 presence, and SharePoint 2013 task sync stay available for the lifetime of each install. Every key is sourced directly from Microsoft authorized channels and delivered to your account dashboard the moment your payment clears, so activation goes through cleanly without invalid-key errors and the same key reactivates after a clean reinstall or hardware change. Standard covers the core Gantt, scheduling, and reporting tools; Professional adds the resource pool, Team Planner, and SharePoint task list sync for multi-project coordination, so double-check the edition on the title before checkout. 📋 📅 ⏱️\u003c\/p\u003e\n\n\u003ch2\u003eWhat Is Included and How Activation Works\u003c\/h2\u003e\n\u003cp\u003eYour 5PC Retail Online license includes one Microsoft \u003ca href=\"\/products\/microsoft-project-2024-standard-bind-1-pc\"\u003eProject 2024 Standard\u003c\/a\u003e 2013 Professional product key that activates the application on up to five Windows PCs. The key is not bound to a Microsoft account; it is bound to the installation, and the same key can be used to reactivate Project 2013 Professional on the same PCs after a clean reinstall. There are no recurring subscription fees.\u003c\/p\u003e\n\u003cp\u003eTo activate, run the Microsoft Project 2013 Professional installer on each Windows PC and enter the 25-character product key when prompted. The installer performs online activation against the Microsoft activation service. An internet connection is required during activation and when applying updates; the application itself runs offline. Touch Mode is automatically engaged on supported hardware and can be toggled manually from the Quick Access Toolbar.\u003c\/p\u003e\n\n\u003ch2\u003eKey Features and Capabilities\u003c\/h2\u003e\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eModern Office 2013 ribbon\u003c\/strong\u003e — a cleaner interface with one-click navigation, contextual tabs, and a redesigned Backstage view for project metadata and printing.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePre-built templates and Gantt charts\u003c\/strong\u003e — start a project in minutes with templates for construction, IT, marketing, and event delivery; timelines can be presented alongside the Gantt chart.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eResource Manager and resource pools\u003c\/strong\u003e — centralise people, equipment, and material resources across multiple .mpp files; identify over-allocations and run leveling to resolve them.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTask Path highlighting\u003c\/strong\u003e — visualise predecessor and successor chains for any selected task; the critical path is rendered in red so the at-risk portion of the schedule is unmissable.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTeam Planner view\u003c\/strong\u003e — arrange work by team member, surface scheduling conflicts, and rebalance workload by dragging tasks across the swim lanes.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTimesheets and status flows\u003c\/strong\u003e — capture project and non-project time, route timesheets through an approval workflow, and feed capacity data into resource planning.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eSharePoint 2013 task list sync\u003c\/strong\u003e — publish project tasks to SharePoint so team members can update progress from a modern browser; changes are pulled back into the master plan.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eSkype for Business (Lync 2013) presence\u003c\/strong\u003e — see availability, start IM, and escalate to a voice or video call with team members directly from inside Project.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eOffice Add-in platform support\u003c\/strong\u003e — read\/write access for Office Add-ins allows custom or third-party tools to interact with project data, schedules, and resources.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eModern PDF and XPS export\u003c\/strong\u003e — produce executive-friendly PDF, XPS, and image exports of any view, including custom reports and dashboards.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eWho This Edition Is For\u003c\/h2\u003e\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eProject managers\u003c\/strong\u003e who want the modernised Office 2013 look and feel paired with the deeper resource and reporting tools of the Professional edition.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIT and engineering teams\u003c\/strong\u003e running Project Server 2013 or SharePoint 2013 on premises, and who need Lync or Skype for Business presence integrated with project collaboration.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePMOs in mid-size organisations\u003c\/strong\u003e that need resource pools, timesheets, and SharePoint task list sync but are not ready to move to Project Online or a Microsoft 365 plan.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTablet-using project managers\u003c\/strong\u003e who need Touch Mode for a more natural interaction with Gantt charts and timelines on touch-enabled Windows devices.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eStandard vs Professional: What Project Adds\u003c\/h2\u003e\n\u003cp\u003eProject Standard is the core project management application: Gantt charts, scheduling, dependencies, milestones, calendars, and built-in reporting. Project Professional adds the features that an organisation needs when it has more than one project running at a time, when it shares resources across teams, or when it wants a tighter collaboration path with SharePoint. The Resource Manager view and the resource pool workflow are the most visible additions, because they let a project manager coordinate shared people and equipment across multiple .mpp files. Team Planner is another Professional-only view, arranging work by team member so that conflicts and over-allocations are easy to see at a glance. SharePoint task list sync, the Office Add-in platform with read\/write access to project data, and the additional Office integration paths round out the collaboration story that the Standard edition does not provide.\u003c\/p\u003e\n\u003cp\u003eFor a single user running a single project, Standard is the right fit and the lower-cost option. For a PMO, a portfolio of related projects, or any team that shares resources across projects, Professional is the typical choice. The perpetual license model means the chosen edition stays available on each activated PC for the lifetime of the installation, with no monthly fees to manage and no auto-renewals to track.\u003c\/p\u003e\n\n\u003ch2\u003eCommon Workflows and Use Cases\u003c\/h2\u003e\n\u003cp\u003e\u003cstrong\u003eSoftware rollout planning.\u003c\/strong\u003e Project managers can use the built-in software rollout template, customise it for the specific release, and assign tasks to engineers, QA, and release managers. The Resource Manager view surfaces overallocation when two engineers are double-booked across the release and the next quarter's maintenance work, and the built-in leveling tool resolves the conflict by shifting the maintenance window. Status updates flow back from team members through the SharePoint task list, so the steering committee can see burndown and earned value analytics through the exported Excel and Power BI reports.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eConstruction and engineering coordination.\u003c\/strong\u003e For a multi-phase construction project, the resource pool holds the contractors, the equipment, and the shared on-site staff. The Team Planner view arranges the schedule by person, so the project manager can see who is on site, who is on the road, and who is overallocated for the week. Task Path highlighting surfaces the critical path, which is essential when a delay in the foundation phase cascades into every subsequent trade. Reporting is exported to PowerPoint for the weekly client update and to Excel for the cost reconciliation that the finance team runs at the end of the month.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eConsulting engagement management.\u003c\/strong\u003e A consulting firm can use a single .mpp file per engagement, with a shared resource pool that holds the partners, the senior consultants, and the staff. The SharePoint task list integration captures timesheets and status updates directly from team members, and the rate tables calculate the engagement margin as work is logged. Inactive tasks let the firm model what-if scenarios for the next quarter's pipeline without disturbing the live engagements.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eMarketing and event delivery.\u003c\/strong\u003e A marketing team running a campaign or an event delivery team running a conference can keep the master Gantt chart in Project and use the timeline view above the Gantt chart to present a clean executive roadmap to stakeholders. The Kanban-style board view (in \u003ca href=\"\/products\/microsoft-project-2021-professional-retail-2-pc\"\u003eProject 2021 Professional\u003c\/a\u003e and later) is the right tool for the daily standup, and the SharePoint task list sync keeps every contributor aligned without requiring them to open Project themselves.\u003c\/p\u003e\n\n\u003ch2\u003eSystem Requirements\u003c\/h2\u003e\n\u003ctable\u003e\n  \u003cthead\u003e\n    \u003ctr\u003e\n\u003cth\u003eComponent\u003c\/th\u003e\n\u003cth\u003eMinimum\u003c\/th\u003e\n\u003cth\u003eRecommended\u003c\/th\u003e\n\u003c\/tr\u003e\n  \u003c\/thead\u003e\n  \u003ctbody\u003e\n    \u003ctr\u003e\n\u003ctd\u003eOperating system\u003c\/td\u003e\n\u003ctd\u003eWindows 7 SP1, Windows 8, Windows 8.1, Windows Server 2008 R2 SP1, Windows Server 2012, Windows Server 2012 R2\u003c\/td\u003e\n\u003ctd\u003eWindows 8.1 or Windows Server 2012 R2 (64-bit)\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eProcessor\u003c\/td\u003e\n\u003ctd\u003e1 GHz or faster x86 or x64 with SSE2\u003c\/td\u003e\n\u003ctd\u003e1.6 GHz or faster, dual-core\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eMemory (RAM)\u003c\/td\u003e\n\u003ctd\u003e1 GB (32-bit) or 2 GB (64-bit)\u003c\/td\u003e\n\u003ctd\u003e4 GB or more\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eHard disk space\u003c\/td\u003e\n\u003ctd\u003e2.5 GB available\u003c\/td\u003e\n\u003ctd\u003e5 GB or more for project files and backups\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eDisplay\u003c\/td\u003e\n\u003ctd\u003e1024 × 768 or higher resolution\u003c\/td\u003e\n\u003ctd\u003e1280 × 800 or higher with DirectX 10 compatible graphics\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eBrowser\u003c\/td\u003e\n\u003ctd\u003eInternet Explorer 8 or later for SharePoint integration\u003c\/td\u003e\n\u003ctd\u003eInternet Explorer 10 or 11, current Edge, or modern Chrome \/ Firefox\u003c\/td\u003e\n\u003c\/tr\u003e\n  \u003c\/tbody\u003e\n\u003c\/table\u003e\n\n\u003ch2\u003eActivation and Licensing Notes\u003c\/h2\u003e\n\u003cp\u003eThe 5PC Retail Online key is a perpetual license for Microsoft Project 2013 Professional. It activates on five Windows PCs and remains valid for the lifetime of the installation on each device. The key can be reused on the same PCs after a reinstall. The license is not bound to a Microsoft account, which keeps the activation path straightforward for offline-first environments and for use in air-gapped networks.\u003c\/p\u003e\n\u003cp\u003eProject 2013 Professional is supported on Windows 7 SP1 and later desktop operating systems from Microsoft. It is not supported on Windows XP or Windows Vista. For the cleanest experience on Windows 10, Microsoft released \u003ca href=\"\/products\/microsoft-project-2016-professional-retail-5-pc\"\u003eProject 2016 Professional\u003c\/a\u003e as the supported successor. If you need to run the application on Windows 11, \u003ca href=\"\/products\/microsoft-project-2019-professional-bind-1-pc\"\u003eProject 2019 Professional\u003c\/a\u003e or \u003ca href=\"\/products\/microsoft-project-2021-professional-retail-5-pc\"\u003eProject 2021 Professional\u003c\/a\u003e is recommended.\u003c\/p\u003e\n\n\u003ch2\u003eGet Started With Microsoft Project 2013 Professional\u003c\/h2\u003e\n\u003cp\u003eDownload the Project 2013 Professional installer from the Microsoft volume licensing center or a trusted source, enter your 5PC product key, and follow the activation wizard. The Microsoft Project 2013 Quick Start guide covers the most common project, resource, and reporting workflows, and the Lync 2013 deployment guide explains how to enable presence inside the Project interface. With a perpetual license, your team has a stable, modern project management tool on five PCs for as long as each Windows installation remains in service.\u003c\/p\u003e\u003ch2\u003eMicrosoft Project 2013 Professional Alternatives\u003c\/h2\u003e\n\u003cp\u003eThree credible alternatives cover most project management workloads.\u003c\/p\u003e\n\u003ch3\u003eMicrosoft Project Online (subscription)\u003c\/h3\u003e\u003cp\u003eCloud-based project management with Power BI reporting, resource engagement, and roadmap features. Best fit for organisations already on the Microsoft 365 platform.\u003c\/p\u003e\u003ch3\u003eAsana\u003c\/h3\u003e\u003cp\u003eModern work management platform with portfolios, goals, and timeline views. Strong fit for cross-functional teams that need both project and task tracking.\u003c\/p\u003e\u003ch3\u003eMonday.com or ClickUp\u003c\/h3\u003e\u003cp\u003eHighly configurable work management platforms with Gantt chart views, automations, and integrations. Best fit for teams that want a single tool for projects, tasks, and CRM-style work.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHow to choose:\u003c\/strong\u003e Stay on Project desktop if you need deep resource management, enterprise project types, and integration with the rest of the Microsoft platform. Choose Project Online for cloud access and Power BI reporting. Choose Asana or Monday if you need a flexible work management tool that goes beyond project scheduling.\u003c\/p\u003e\n\n\u003ch2\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eDoes Project 2013 Professional support Touch Mode on tablet hardware?\u003c\/summary\u003e\n  \u003cp\u003eYes. Project 2013 includes Touch Mode, which increases spacing between ribbon controls and on-screen elements for finger-friendly operation. The mode is automatically enabled on touch-enabled devices and can be toggled manually from the Quick Access Toolbar.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eCan I open my existing Project 2010 files in Project 2013?\u003c\/summary\u003e\n  \u003cp\u003eYes. The .mpp file format is forward-compatible. Project 2013 reads .mpp files from Project 2010 and earlier releases. You can save in the 2010 format if you need to share plans with users still on the older release.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eDoes the Professional edition connect to Project Server 2013?\u003c\/summary\u003e\n  \u003cp\u003eYes. Project 2013 Professional connects to Project Server 2013 for centralised resource pools, portfolio analysis, demand management, and the timesheet and status workflow that Project Server exposes through SharePoint 2013.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eWhat happens to my data if I deactivate the application?\u003c\/summary\u003e\n  \u003cp\u003eDeactivating Project 2013 Professional does not delete any project files. The project data stays in the .mpp file on disk. Deactivation simply frees up an activation slot so the same key can be installed on a different PC, or so the same PC can be reactivated after a reinstall.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eIs Microsoft 365 or a Project Online subscription required?\u003c\/summary\u003e\n  \u003cp\u003eNo. Project 2013 Professional is a fully installed desktop application. It does not require a Microsoft 365 subscription. Optional integration with Project Server 2013 on premises, or with SharePoint 2013, requires those servers to be deployed on the network.\u003c\/p\u003e\n\u003c\/details\u003e\n\n","brand":"Microsoft","offers":[{"title":"Default Title","offer_id":59850907942993,"sku":"MS-044-MICROSOFT-PROJECT-2013-PROFESSIONAL-RETA","price":14.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1059\/0191\/6241\/files\/microsoft-project-2013-professional-retail-5-pc.webp?v=1784725515"},{"product_id":"microsoft-project-2016-professional-retail-5-pc","title":"Microsoft Project 2016 Professional Retail [5 PC]","description":"\u003ch2\u003eMicrosoft Project 2016 Professional for Resource-Driven Project Work\u003c\/h2\u003e\n\u003cp\u003e\u003ca href=\"\/products\/microsoft-project-2016-professional-retail-5-pc\"\u003eMicrosoft Project 2016 Professional\u003c\/a\u003e is the desktop project and portfolio management application for organisations that have standardised on the Office 2016 generation. It brings forward the resource pool, multi-project coordination, and business intelligence reporting that project managers have relied on since the 2010 release, while taking advantage of the modernised Office 2016 look and the Skype for Business integration that became standard for Microsoft productivity tools in that generation. \u003ca href=\"\/products\/microsoft-project-2010-professional-retail-5-pc\"\u003eProject 2010 Professional\u003c\/a\u003e 2016 Professional is delivered as a one-time, perpetual license. Activation is a clean one-time step on each Windows PC, with no subscription portal to manage and no monthly usage fees — the modernised Office 2016 ribbon, Skype for Business presence, and resource pool stay available for the lifetime of each install. Every key is sourced directly from Microsoft authorized channels and delivered to your account dashboard the moment your payment clears, so activation goes through cleanly without invalid-key errors and the same key reactivates after a clean reinstall or hardware change. Standard covers the core Gantt, scheduling, and reporting tools; Professional adds the resource pool, Team Planner, and SharePoint task list sync for multi-project coordination, so double-check the edition on the title before checkout. 📋 ⏱️ 📅\u003c\/p\u003e\n\n\u003ch2\u003eWhat Is Included and How Activation Works\u003c\/h2\u003e\n\u003cp\u003eYour 5PC Retail Online license includes one Microsoft \u003ca href=\"\/products\/microsoft-project-2024-professional-bind-1-pc\"\u003eProject 2024 Professional\u003c\/a\u003e 2016 Professional product key that activates the application on up to five Windows PCs. The license is perpetual, so there are no subscription fees to manage. The same key can be used to reactivate \u003ca href=\"\/products\/microsoft-project-2024-standard-bind-1-pc\"\u003eProject 2024 Standard\u003c\/a\u003e 2016 Professional on the same PCs after a clean reinstall of the operating system or after a hardware refresh.\u003c\/p\u003e\n\u003cp\u003eTo activate, run the Microsoft Project 2016 Professional installer on each Windows PC, enter the 25-character product key when prompted, and complete the online activation against the Microsoft activation service. An internet connection is required only for activation and for downloading updates; the application itself runs entirely offline once activated.\u003c\/p\u003e\n\n\u003ch2\u003eKey Features and Capabilities\u003c\/h2\u003e\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eBuilt-in Gantt charts and templates\u003c\/strong\u003e — start a project in minutes with templates for software rollouts, construction, marketing campaigns, and event delivery; timelines are presented alongside the Gantt chart.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eResource Manager and resource pools\u003c\/strong\u003e — centralise people, equipment, and material resources across multiple .mpp files; identify over-allocations and run leveling to resolve them automatically.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTask Path highlighting\u003c\/strong\u003e — visualise the chain of predecessors and successors for any selected task; the critical path is rendered in red so at-risk work is visible at a glance.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTeam Planner view\u003c\/strong\u003e — a swim-lane view that arranges work by team member, surfaces scheduling conflicts side by side, and lets the project manager drag and drop tasks to rebalance the team.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eResource capacity heat maps\u003c\/strong\u003e — visualise overallocation, under-utilisation, and bench time across the team in a single colour-coded report.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTimesheets and status flows\u003c\/strong\u003e — capture project and non-project time, route timesheets through an approval workflow, and feed capacity data into resource planning.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eSharePoint 2016 task list sync\u003c\/strong\u003e — publish project tasks to SharePoint 2016 so team members can update progress from a modern browser; changes are pulled back into the master plan.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eSkype for Business presence\u003c\/strong\u003e — see availability, start IM, and escalate to a voice or video call with team members directly from inside Project.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eOffice Add-in platform support\u003c\/strong\u003e — read\/write access for Office Add-ins lets custom or third-party tools interact with project data, schedules, and resources.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eExport to PowerPoint, Excel, Visio, and PDF\u003c\/strong\u003e — produce executive-friendly reports and dashboards for steering committees and stakeholders.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eWho This Edition Is For\u003c\/h2\u003e\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eProject management offices\u003c\/strong\u003e running a portfolio of related projects that share resources and need consolidated status reporting through SharePoint.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIT and engineering teams\u003c\/strong\u003e standardising on the Office 2016 generation and Skype for Business, who need resource management and presence-aware collaboration inside the project tool.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eConstruction and engineering project managers\u003c\/strong\u003e coordinating contractors, internal staff, and equipment across multiple job sites with resource pools and capacity heat maps.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eMid-size organisations\u003c\/strong\u003e that need the Professional-grade resource and reporting tools but prefer a perpetual desktop license over a Project Online or Microsoft 365 subscription.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eStandard vs Professional: What Project Adds\u003c\/h2\u003e\n\u003cp\u003eProject Standard is the core project management application: Gantt charts, scheduling, dependencies, milestones, calendars, and built-in reporting. Project Professional adds the features that an organisation needs when it has more than one project running at a time, when it shares resources across teams, or when it wants a tighter collaboration path with SharePoint. The Resource Manager view and the resource pool workflow are the most visible additions, because they let a project manager coordinate shared people and equipment across multiple .mpp files. Team Planner is another Professional-only view, arranging work by team member so that conflicts and over-allocations are easy to see at a glance. SharePoint task list sync, the Office Add-in platform with read\/write access to project data, and the additional Office integration paths round out the collaboration story that the Standard edition does not provide.\u003c\/p\u003e\n\u003cp\u003eFor a single user running a single project, Standard is the right fit and the lower-cost option. For a PMO, a portfolio of related projects, or any team that shares resources across projects, Professional is the typical choice. The perpetual license model means the chosen edition stays available on each activated PC for the lifetime of the installation, with no monthly fees to manage and no auto-renewals to track.\u003c\/p\u003e\n\n\u003ch2\u003eCommon Workflows and Use Cases\u003c\/h2\u003e\n\u003cp\u003e\u003cstrong\u003eSoftware rollout planning.\u003c\/strong\u003e Project managers can use the built-in software rollout template, customise it for the specific release, and assign tasks to engineers, QA, and release managers. The Resource Manager view surfaces overallocation when two engineers are double-booked across the release and the next quarter's maintenance work, and the built-in leveling tool resolves the conflict by shifting the maintenance window. Status updates flow back from team members through the SharePoint task list, so the steering committee can see burndown and earned value analytics through the exported Excel and Power BI reports.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eConstruction and engineering coordination.\u003c\/strong\u003e For a multi-phase construction project, the resource pool holds the contractors, the equipment, and the shared on-site staff. The Team Planner view arranges the schedule by person, so the project manager can see who is on site, who is on the road, and who is overallocated for the week. Task Path highlighting surfaces the critical path, which is essential when a delay in the foundation phase cascades into every subsequent trade. Reporting is exported to PowerPoint for the weekly client update and to Excel for the cost reconciliation that the finance team runs at the end of the month.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eConsulting engagement management.\u003c\/strong\u003e A consulting firm can use a single .mpp file per engagement, with a shared resource pool that holds the partners, the senior consultants, and the staff. The SharePoint task list integration captures timesheets and status updates directly from team members, and the rate tables calculate the engagement margin as work is logged. Inactive tasks let the firm model what-if scenarios for the next quarter's pipeline without disturbing the live engagements.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eMarketing and event delivery.\u003c\/strong\u003e A marketing team running a campaign or an event delivery team running a conference can keep the master Gantt chart in Project and use the timeline view above the Gantt chart to present a clean executive roadmap to stakeholders. The Kanban-style board view (in \u003ca href=\"\/products\/microsoft-project-2021-professional-retail-2-pc\"\u003eProject 2021 Professional\u003c\/a\u003e and later) is the right tool for the daily standup, and the SharePoint task list sync keeps every contributor aligned without requiring them to open Project themselves.\u003c\/p\u003e\n\n\u003ch2\u003eSystem Requirements\u003c\/h2\u003e\n\u003ctable\u003e\n  \u003cthead\u003e\n    \u003ctr\u003e\n\u003cth\u003eComponent\u003c\/th\u003e\n\u003cth\u003eMinimum\u003c\/th\u003e\n\u003cth\u003eRecommended\u003c\/th\u003e\n\u003c\/tr\u003e\n  \u003c\/thead\u003e\n  \u003ctbody\u003e\n    \u003ctr\u003e\n\u003ctd\u003eOperating system\u003c\/td\u003e\n\u003ctd\u003eWindows 7 SP1, Windows 8.1, Windows 10 (32-bit or 64-bit), Windows Server 2008 R2, Windows Server 2012, Windows Server 2012 R2\u003c\/td\u003e\n\u003ctd\u003eWindows 10 (64-bit) or Windows Server 2016\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eProcessor\u003c\/td\u003e\n\u003ctd\u003e1 GHz or faster x86 or x64 with SSE2\u003c\/td\u003e\n\u003ctd\u003e1.6 GHz or faster, dual-core\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eMemory (RAM)\u003c\/td\u003e\n\u003ctd\u003e1 GB (32-bit) or 2 GB (64-bit)\u003c\/td\u003e\n\u003ctd\u003e4 GB or more\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eHard disk space\u003c\/td\u003e\n\u003ctd\u003e3.0 GB available\u003c\/td\u003e\n\u003ctd\u003e6 GB or more for project files and backups\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eDisplay\u003c\/td\u003e\n\u003ctd\u003e1024 × 768 or higher resolution\u003c\/td\u003e\n\u003ctd\u003e1280 × 800 or higher with DirectX 10 compatible graphics\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eInternet\u003c\/td\u003e\n\u003ctd\u003eRequired for activation, optional for product use\u003c\/td\u003e\n\u003ctd\u003eBroadband for SharePoint sync and Skype for Business presence\u003c\/td\u003e\n\u003c\/tr\u003e\n  \u003c\/tbody\u003e\n\u003c\/table\u003e\n\n\u003ch2\u003eActivation and Licensing Notes\u003c\/h2\u003e\n\u003cp\u003eThe 5PC Retail Online key is a perpetual license for Microsoft Project 2016 Professional. It activates on five Windows PCs and remains valid for the lifetime of the installation on each device. The key can be reused on the same PCs after a reinstall. The license is not bound to a Microsoft account. There is no version upgrade included: to move to a newer Project release, a separate license must be purchased.\u003c\/p\u003e\n\u003cp\u003eProject 2016 Professional supports both 32-bit and 64-bit editions of Windows. The 64-bit install is recommended for projects that exceed 5,000 tasks or that work with multiple resource pools, because the larger address space improves performance noticeably. For deployments that include SharePoint 2016 sync, the SharePoint 2016 server environment must be available on the network.\u003c\/p\u003e\n\n\u003ch2\u003eGet Started With Microsoft Project 2016 Professional\u003c\/h2\u003e\n\u003cp\u003eDownload the Project 2016 Professional installer from the Microsoft volume licensing center or your trusted source, enter your 5PC product key, and follow the activation wizard. The Microsoft Project 2016 Quick Start guide covers the most common project, resource, and reporting workflows, and the SharePoint 2016 sync admin guide explains how to enable task list publishing for your team. With a perpetual license, your team has a stable, professionally supported project management tool on five PCs for as long as each Windows installation remains in service.\u003c\/p\u003e\u003ch2\u003eMicrosoft Project 2016 Professional Alternatives\u003c\/h2\u003e\n\u003cp\u003eThree credible alternatives cover most project management workloads.\u003c\/p\u003e\n\u003ch3\u003eMicrosoft Project Online (subscription)\u003c\/h3\u003e\u003cp\u003eCloud-based project management with Power BI reporting, resource engagement, and roadmap features. Best fit for organisations already on the Microsoft 365 platform.\u003c\/p\u003e\u003ch3\u003eAsana\u003c\/h3\u003e\u003cp\u003eModern work management platform with portfolios, goals, and timeline views. Strong fit for cross-functional teams that need both project and task tracking.\u003c\/p\u003e\u003ch3\u003eMonday.com or ClickUp\u003c\/h3\u003e\u003cp\u003eHighly configurable work management platforms with Gantt chart views, automations, and integrations. Best fit for teams that want a single tool for projects, tasks, and CRM-style work.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHow to choose:\u003c\/strong\u003e Stay on Project desktop if you need deep resource management, enterprise project types, and integration with the rest of the Microsoft platform. Choose Project Online for cloud access and Power BI reporting. Choose Asana or Monday if you need a flexible work management tool that goes beyond project scheduling.\u003c\/p\u003e\n\n\u003ch2\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eDoes this license include Skype for Business?\u003c\/summary\u003e\n  \u003cp\u003eNo. Project 2016 Professional integrates with Skype for Business when Skype for Business is installed and licensed separately on the same machine. The Project license covers the desktop project application only.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eCan I upgrade to Project 2019 or Project 2021 at a discount?\u003c\/summary\u003e\n  \u003cp\u003eMicrosoft does not provide a free upgrade path from Project 2016 to a newer release. The two paths are side-by-side installation on the same Windows PC (if there is no licensing conflict) or a clean replacement of Project 2016 with the newer version, with the .mpp file format remaining compatible throughout.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eDoes Project 2016 Professional support multi-touch and tablet use?\u003c\/summary\u003e\n  \u003cp\u003eProject 2016 supports multi-touch input on devices running Windows 8.1 or Windows 10. The application can be paired with a stylus or used with finger gestures on touch screens, and it remains fully functional with keyboard and mouse on standard desktop hardware.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eWhat is the difference between the 5PC Retail Online key and a volume license?\u003c\/summary\u003e\n  \u003cp\u003eThe 5PC Retail Online key is a perpetual license for five Windows PCs with no contract or enrolment. A Microsoft Volume License (VL) agreement is typically used by larger organisations that need reassignment rights, downgrade rights, or centralised reporting through the Volume Licensing Service Center. The Retail Online key is the right choice for small teams that need five activations and a simple procurement path.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eIs an internet connection required to use the application?\u003c\/summary\u003e\n  \u003cp\u003eNo, once Project 2016 Professional is activated, the application runs entirely offline. An internet connection is only required for activation, updates, and the optional SharePoint task list sync and Skype for Business presence features.\u003c\/p\u003e\n\u003c\/details\u003e\n\n","brand":"Microsoft","offers":[{"title":"Default Title","offer_id":59850908106833,"sku":"MS-045-MICROSOFT-PROJECT-2016-PROFESSIONAL-RETA","price":14.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1059\/0191\/6241\/files\/microsoft-project-2016-professional-retail-5-pc.webp?v=1784725517"},{"product_id":"microsoft-project-2019-professional-bind-1-pc","title":"Microsoft Project 2019 Professional BIND [1 PC]","description":"\u003ch2\u003eMicrosoft Project 2019 Professional on a Single Windows PC\u003c\/h2\u003e\n\u003cp\u003e\u003ca href=\"\/products\/microsoft-project-2019-professional-bind-1-pc\"\u003eMicrosoft Project 2019 Professional\u003c\/a\u003e is the desktop project and portfolio management application for project managers who need the deeper resource and reporting tools that the Standard edition does not provide. The 2019 release introduces a modernised ribbon, dark mode, improved accessibility, and timeline bar labels that show progress directly on the Gantt chart. The 1PC BIND license is delivered as a Microsoft account–bound key, which keeps the license attached to the user rather than to the hardware. When the project manager signs in on a new PC, the \u003ca href=\"\/products\/microsoft-project-2019-professional-retail-5-pc\"\u003eProject 2019 Professional\u003c\/a\u003e license reattaches to the Microsoft account and the same Gantt plans, resource pool, and timeline view come back online without re-purchasing, with no subscription portal to manage and no monthly usage fees. Every key is sourced directly from Microsoft authorized channels and delivered to your account dashboard the moment your payment clears, so activation goes through cleanly without invalid-key errors and the same key reactivates after a clean reinstall or hardware change. Standard covers the core Gantt, scheduling, and reporting tools; Professional adds the resource pool, Team Planner, and SharePoint task list sync for multi-project coordination, so double-check the edition on the title before checkout. 📅 ⏱️ 📋\u003c\/p\u003e\n\n\u003ch2\u003eWhat Is Included and How Activation Works\u003c\/h2\u003e\n\u003cp\u003eYour 1PC BIND license includes one Microsoft \u003ca href=\"\/products\/microsoft-project-2019-standard-retail-5-pc\"\u003eProject 2019 Standard\u003c\/a\u003e Professional product key that activates the application on a single Windows PC, bound to your Microsoft account. The license is perpetual, so there are no subscription fees to manage. To activate, sign in to setup.office.com with your Microsoft account, enter the 25-character product key, and download the \u003ca href=\"\/products\/microsoft-project-2016-professional-retail-5-pc\"\u003eProject 2016 Professional\u003c\/a\u003e 2019 Professional installer.\u003c\/p\u003e\n\u003cp\u003eOnce the installer is downloaded, run it on the Windows PC you want to use as your primary workstation, sign in to the same Microsoft account when prompted, and the application activates automatically. The license is associated with the account, so if you replace the workstation, you can sign in on the new device and reinstall \u003ca href=\"\/products\/microsoft-project-2024-professional-bind-1-pc\"\u003eProject 2024 Professional\u003c\/a\u003e 2019 Professional from your account without contacting support for a new key.\u003c\/p\u003e\n\n\u003ch2\u003eKey Features and Capabilities\u003c\/h2\u003e\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eModern Office 2019 ribbon and dark mode\u003c\/strong\u003e — the Fluent design language aligns \u003ca href=\"\/products\/microsoft-project-2013-professional-retail-5-pc\"\u003eProject 2013 Professional\u003c\/a\u003e 2019 with the rest of the Office 2019 family, and dark mode reduces eye strain for project managers who spend long hours in the application.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePre-built Gantt charts and templates\u003c\/strong\u003e — start a project in minutes with templates for software rollouts, construction, marketing campaigns, and event delivery; timelines are presented alongside the Gantt chart.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eResource Manager and resource pools\u003c\/strong\u003e — centralise people, equipment, and material resources across multiple .mpp files; identify over-allocations and run leveling to resolve them automatically.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTask Path highlighting\u003c\/strong\u003e — visualise the chain of predecessors and successors for any selected task; the critical path is rendered in red so at-risk work is visible at a glance.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTeam Planner view\u003c\/strong\u003e — a swim-lane view that arranges work by team member, surfaces scheduling conflicts side by side, and lets the project manager drag and drop tasks to rebalance the team.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTimeline bar labels\u003c\/strong\u003e — a \u003ca href=\"\/products\/microsoft-project-2010-professional-retail-5-pc\"\u003eProject 2010 Professional\u003c\/a\u003e 2019 addition that shows task progress directly on the Gantt chart, removing the need to switch into a separate view to check status.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eResource capacity heat maps\u003c\/strong\u003e — visualise overallocation, under-utilisation, and bench time across the team in a single colour-coded report.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eSharePoint task list sync\u003c\/strong\u003e — publish project tasks to SharePoint so team members can update progress from a modern browser; changes are pulled back into the master plan.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eAccessibility upgrades\u003c\/strong\u003e — improved keyboard navigation, zoomable reports, and integrated Narrator support make the application more usable for project managers with visual or motor accessibility needs.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eOffice Add-in platform support\u003c\/strong\u003e — read\/write access for Office Add-ins lets custom or third-party tools interact with project data, schedules, and resources.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eWho This Edition Is For\u003c\/h2\u003e\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIndividual project managers\u003c\/strong\u003e who need the Professional-grade resource and reporting tools on a single Windows PC, with a modern Microsoft account binding flow.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIT project leads and PMO analysts\u003c\/strong\u003e who want a perpetual \u003ca href=\"\/products\/microsoft-project-2024-standard-bind-1-pc\"\u003eProject 2024 Standard\u003c\/a\u003e 2019 Professional license without committing to a Microsoft 365 subscription.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eConsultants and contractors\u003c\/strong\u003e who need a single, portable Project license that can be moved to a new workstation by signing in to their Microsoft account.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eOrganisations standardising on Office 2019\u003c\/strong\u003e that want the modernised Fluent design language and dark mode aligned with the rest of the Office family.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eStandard vs Professional: What Project Adds\u003c\/h2\u003e\n\u003cp\u003eProject Standard is the core project management application: Gantt charts, scheduling, dependencies, milestones, calendars, and built-in reporting. Project Professional adds the features that an organisation needs when it has more than one project running at a time, when it shares resources across teams, or when it wants a tighter collaboration path with SharePoint. The Resource Manager view and the resource pool workflow are the most visible additions, because they let a project manager coordinate shared people and equipment across multiple .mpp files. Team Planner is another Professional-only view, arranging work by team member so that conflicts and over-allocations are easy to see at a glance. SharePoint task list sync, the Office Add-in platform with read\/write access to project data, and the additional Office integration paths round out the collaboration story that the Standard edition does not provide.\u003c\/p\u003e\n\u003cp\u003eFor a single user running a single project, Standard is the right fit and the lower-cost option. For a PMO, a portfolio of related projects, or any team that shares resources across projects, Professional is the typical choice. The perpetual license model means the chosen edition stays available on each activated PC for the lifetime of the installation, with no monthly fees to manage and no auto-renewals to track.\u003c\/p\u003e\n\n\u003ch2\u003eCommon Workflows and Use Cases\u003c\/h2\u003e\n\u003cp\u003e\u003cstrong\u003eSoftware rollout planning.\u003c\/strong\u003e Project managers can use the built-in software rollout template, customise it for the specific release, and assign tasks to engineers, QA, and release managers. The Resource Manager view surfaces overallocation when two engineers are double-booked across the release and the next quarter's maintenance work, and the built-in leveling tool resolves the conflict by shifting the maintenance window. Status updates flow back from team members through the SharePoint task list, so the steering committee can see burndown and earned value analytics through the exported Excel and Power BI reports.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eConstruction and engineering coordination.\u003c\/strong\u003e For a multi-phase construction project, the resource pool holds the contractors, the equipment, and the shared on-site staff. The Team Planner view arranges the schedule by person, so the project manager can see who is on site, who is on the road, and who is overallocated for the week. Task Path highlighting surfaces the critical path, which is essential when a delay in the foundation phase cascades into every subsequent trade. Reporting is exported to PowerPoint for the weekly client update and to Excel for the cost reconciliation that the finance team runs at the end of the month.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eConsulting engagement management.\u003c\/strong\u003e A consulting firm can use a single .mpp file per engagement, with a shared resource pool that holds the partners, the senior consultants, and the staff. The SharePoint task list integration captures timesheets and status updates directly from team members, and the rate tables calculate the engagement margin as work is logged. Inactive tasks let the firm model what-if scenarios for the next quarter's pipeline without disturbing the live engagements.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eMarketing and event delivery.\u003c\/strong\u003e A marketing team running a campaign or an event delivery team running a conference can keep the master Gantt chart in Project and use the timeline view above the Gantt chart to present a clean executive roadmap to stakeholders. The Kanban-style board view (in \u003ca href=\"\/products\/microsoft-project-2021-professional-retail-2-pc\"\u003eProject 2021 Professional\u003c\/a\u003e and later) is the right tool for the daily standup, and the SharePoint task list sync keeps every contributor aligned without requiring them to open Project themselves.\u003c\/p\u003e\n\n\u003ch2\u003eSystem Requirements\u003c\/h2\u003e\n\u003ctable\u003e\n  \u003cthead\u003e\n    \u003ctr\u003e\n\u003cth\u003eComponent\u003c\/th\u003e\n\u003cth\u003eMinimum\u003c\/th\u003e\n\u003cth\u003eRecommended\u003c\/th\u003e\n\u003c\/tr\u003e\n  \u003c\/thead\u003e\n  \u003ctbody\u003e\n    \u003ctr\u003e\n\u003ctd\u003eOperating system\u003c\/td\u003e\n\u003ctd\u003eWindows 10 (32-bit or 64-bit), Windows Server 2016, Windows Server 2019\u003c\/td\u003e\n\u003ctd\u003eWindows 10 or Windows 11 (64-bit) with the latest cumulative updates\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eProcessor\u003c\/td\u003e\n\u003ctd\u003e1.6 GHz or faster, 2-core\u003c\/td\u003e\n\u003ctd\u003e2.0 GHz or faster, multi-core\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eMemory (RAM)\u003c\/td\u003e\n\u003ctd\u003e2 GB (32-bit) or 4 GB (64-bit)\u003c\/td\u003e\n\u003ctd\u003e8 GB for projects with resource pools and large .mpp files\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eHard disk space\u003c\/td\u003e\n\u003ctd\u003e4.0 GB available\u003c\/td\u003e\n\u003ctd\u003eSSD with 8 GB or more free for project files and backups\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eDisplay\u003c\/td\u003e\n\u003ctd\u003e1280 × 768 or higher resolution\u003c\/td\u003e\n\u003ctd\u003e1920 × 1080 or higher with DirectX 10 graphics\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eInternet\u003c\/td\u003e\n\u003ctd\u003eRequired for account binding and updates\u003c\/td\u003e\n\u003ctd\u003eBroadband for SharePoint sync and Office Add-in marketplace\u003c\/td\u003e\n\u003c\/tr\u003e\n  \u003c\/tbody\u003e\n\u003c\/table\u003e\n\n\u003ch2\u003eActivation and Licensing Notes\u003c\/h2\u003e\n\u003cp\u003eThe 1PC BIND license is a perpetual license for Microsoft Project 2019 Professional on a single Windows PC, bound to your Microsoft account. Once the key is redeemed at setup.office.com, the license is attached to the account and the installer downloads the application to the active device. The license follows the account: if you replace the workstation, sign in to the new device with the same Microsoft account and reinstall Project 2019 Professional from the account page.\u003c\/p\u003e\n\u003cp\u003eProject 2019 Professional is supported on Windows 10 and Windows Server 2016 or later. It is the right Project version to deploy on Windows 11 in offline mode. For organisations that have moved to Microsoft 365 Apps, Project 2019 Professional can be installed side by side with the Office 365 apps without conflict, provided the .mpp file association is set explicitly.\u003c\/p\u003e\n\n\u003ch2\u003eGet Started With Microsoft Project 2019 Professional\u003c\/h2\u003e\n\u003cp\u003eVisit setup.office.com, sign in with your Microsoft account, and enter the 25-character product key. Download the Project 2019 Professional installer, run it on your Windows PC, and sign in to the same Microsoft account when prompted. The Microsoft Project 2019 Quick Start guide covers the most common project, resource, and reporting workflows. With a perpetual, account-bound license, your Professional-grade project management tool follows your Microsoft account and is ready to use on your primary workstation for as long as you keep the installation.\u003c\/p\u003e\u003ch2\u003eMicrosoft Project 2019 Professional Alternatives\u003c\/h2\u003e\n\u003cp\u003eThree credible alternatives cover most project management workloads.\u003c\/p\u003e\n\u003ch3\u003eMicrosoft Project Online (subscription)\u003c\/h3\u003e\u003cp\u003eCloud-based project management with Power BI reporting, resource engagement, and roadmap features. Best fit for organisations already on the Microsoft 365 platform.\u003c\/p\u003e\u003ch3\u003eAsana\u003c\/h3\u003e\u003cp\u003eModern work management platform with portfolios, goals, and timeline views. Strong fit for cross-functional teams that need both project and task tracking.\u003c\/p\u003e\u003ch3\u003eMonday.com or ClickUp\u003c\/h3\u003e\u003cp\u003eHighly configurable work management platforms with Gantt chart views, automations, and integrations. Best fit for teams that want a single tool for projects, tasks, and CRM-style work.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHow to choose:\u003c\/strong\u003e Stay on Project desktop if you need deep resource management, enterprise project types, and integration with the rest of the Microsoft platform. Choose Project Online for cloud access and Power BI reporting. Choose Asana or Monday if you need a flexible work management tool that goes beyond project scheduling.\u003c\/p\u003e\n\n\u003ch2\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eWhat does BIND mean for this license?\u003c\/summary\u003e\n  \u003cp\u003eBIND means the product key is redeemed at setup.office.com and the resulting license is attached to your Microsoft account rather than to the PC. This makes it straightforward to move the installation to a new device, because the license is downloaded from your account rather than activated against hardware.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eCan I install Project 2019 Professional on a second PC?\u003c\/summary\u003e\n  \u003cp\u003eThe 1PC BIND license is for a single Windows PC. If you need to install Project on a second PC, you should purchase a second 1PC BIND license. The 5PC Retail Online variant of Project 2019 Professional is the right option if you need to cover multiple devices.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eDoes Project 2019 Professional run on Windows 11?\u003c\/summary\u003e\n  \u003cp\u003eYes. Project 2019 Professional is supported on Windows 10 and on Windows 11. The .mpp file format and the user experience are identical on both operating systems.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eIs a Microsoft 365 subscription required?\u003c\/summary\u003e\n  \u003cp\u003eNo. Project 2019 Professional is a fully installed desktop application. The BIND activation flow uses a Microsoft account, but no Microsoft 365 subscription is required. The application continues to work after the initial activation, even if the Microsoft account is removed from the Office 365 plan.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eWhat happens to my .mpp files if I switch to a new device?\u003c\/summary\u003e\n  \u003cp\u003eThe .mpp files live on the device disk and must be moved manually. OneDrive for Business, SharePoint, or any file sync tool is the recommended way to keep project files available across multiple devices, including the new workstation.\u003c\/p\u003e\n\u003c\/details\u003e\n\n","brand":"Microsoft","offers":[{"title":"Default Title","offer_id":59850908172369,"sku":"MS-046-MICROSOFT-PROJECT-2019-PROFESSIONAL-BIND","price":24.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1059\/0191\/6241\/files\/microsoft-project-2019-professional-bind-1-pc.webp?v=1784725519"},{"product_id":"microsoft-project-2019-professional-retail-2-pc","title":"Microsoft Project 2019 Professional Retail [2 PC]","description":"\u003ch2\u003eMicrosoft Project 2019 Professional on Two Windows PCs\u003c\/h2\u003e\n\u003cp\u003e\u003ca href=\"\/products\/microsoft-project-2019-professional-retail-2-pc\"\u003eMicrosoft Project 2019 Professional\u003c\/a\u003e is the desktop project and portfolio management application for project managers who need the deeper resource and reporting tools that the Standard edition does not provide. The 2019 release introduces a modernised ribbon, dark mode, improved accessibility, and timeline bar labels that show progress directly on the Gantt chart. The 2PC Retail Online license is designed for a project manager and a deputy, or for a project lead who alternates between a desktop and a laptop workstation. Activation is a clean one-time step on each of the two Windows PCs, with no subscription portal to manage and no monthly usage fees — the same resource pool, multi-project coordination, and SharePoint task list sync stay available on both installs for the lifetime of the desktop application. Every key is sourced directly from Microsoft authorized channels and delivered to your account dashboard the moment your payment clears, so activation goes through cleanly without invalid-key errors and the same key reactivates after a clean reinstall or hardware change. Standard covers the core Gantt, scheduling, and reporting tools; Professional adds the resource pool, Team Planner, and SharePoint task list sync for multi-project coordination, so double-check the edition on the title before checkout. 📋 ⏱️ 📅\u003c\/p\u003e\n\n\u003ch2\u003eWhat Is Included and How Activation Works\u003c\/h2\u003e\n\u003cp\u003eYour 2PC Retail Online license includes one Microsoft \u003ca href=\"\/products\/microsoft-project-2019-professional-retail-5-pc\"\u003eProject 2019 Professional\u003c\/a\u003e product key that activates the application on up to two Windows PCs. The license is perpetual, so there are no subscription fees to manage. The same key can be used to reactivate \u003ca href=\"\/products\/microsoft-project-2016-professional-retail-5-pc\"\u003eProject 2016 Professional\u003c\/a\u003e 2019 Professional on the same PCs after a clean reinstall of the operating system or after a hardware refresh.\u003c\/p\u003e\n\u003cp\u003eTo activate, run the Microsoft \u003ca href=\"\/products\/microsoft-project-2013-professional-retail-5-pc\"\u003eProject 2013 Professional\u003c\/a\u003e 2019 Professional installer on each Windows PC, enter the 25-character product key when prompted, and complete the online activation against the Microsoft activation service. An internet connection is required only for activation and for downloading updates; the application itself runs entirely offline once activated.\u003c\/p\u003e\n\n\u003ch2\u003eKey Features and Capabilities\u003c\/h2\u003e\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eModern Office 2019 ribbon and dark mode\u003c\/strong\u003e — the Fluent design language aligns \u003ca href=\"\/products\/microsoft-project-2010-professional-retail-5-pc\"\u003eProject 2010 Professional\u003c\/a\u003e 2019 with the rest of the Office 2019 family, and dark mode reduces eye strain for project managers who spend long hours in the application.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePre-built Gantt charts and templates\u003c\/strong\u003e — start a project in minutes with templates for software rollouts, construction, marketing campaigns, and event delivery; timelines are presented alongside the Gantt chart.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eResource Manager and resource pools\u003c\/strong\u003e — centralise people, equipment, and material resources across multiple .mpp files; identify over-allocations and run leveling to resolve them automatically.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTask Path highlighting\u003c\/strong\u003e — visualise the chain of predecessors and successors for any selected task; the critical path is rendered in red so at-risk work is visible at a glance.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTeam Planner view\u003c\/strong\u003e — a swim-lane view that arranges work by team member, surfaces scheduling conflicts side by side, and lets the project manager drag and drop tasks to rebalance the team.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTimeline bar labels\u003c\/strong\u003e — a Project 2019 addition that shows task progress directly on the Gantt chart, removing the need to switch into a separate view to check status.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eResource capacity heat maps\u003c\/strong\u003e — visualise overallocation, under-utilisation, and bench time across the team in a single colour-coded report.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eSharePoint task list sync\u003c\/strong\u003e — publish project tasks to SharePoint so team members can update progress from a modern browser; changes are pulled back into the master plan.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eAccessibility upgrades\u003c\/strong\u003e — improved keyboard navigation, zoomable reports, and integrated Narrator support make the application more usable for project managers with visual or motor accessibility needs.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eOffice Add-in platform support\u003c\/strong\u003e — read\/write access for Office Add-ins lets custom or third-party tools interact with project data, schedules, and resources.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eWho This Edition Is For\u003c\/h2\u003e\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eProject managers with a deputy\u003c\/strong\u003e who both need Professional-grade resource and reporting tools on a dedicated Windows PC.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eProject leads\u003c\/strong\u003e who alternate between a desktop workstation and a laptop, and need the same Professional capability on both devices.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eSmall PMO teams\u003c\/strong\u003e running a portfolio of related projects that share resources and need consolidated status reporting through SharePoint.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eConsulting and professional services firms\u003c\/strong\u003e that need a perpetual Project Professional license for two members of the team without committing to a Microsoft 365 subscription.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eStandard vs Professional: What Project Adds\u003c\/h2\u003e\n\u003cp\u003eProject Standard is the core project management application: Gantt charts, scheduling, dependencies, milestones, calendars, and built-in reporting. Project Professional adds the features that an organisation needs when it has more than one project running at a time, when it shares resources across teams, or when it wants a tighter collaboration path with SharePoint. The Resource Manager view and the resource pool workflow are the most visible additions, because they let a project manager coordinate shared people and equipment across multiple .mpp files. Team Planner is another Professional-only view, arranging work by team member so that conflicts and over-allocations are easy to see at a glance. SharePoint task list sync, the Office Add-in platform with read\/write access to project data, and the additional Office integration paths round out the collaboration story that the Standard edition does not provide.\u003c\/p\u003e\n\u003cp\u003eFor a single user running a single project, Standard is the right fit and the lower-cost option. For a PMO, a portfolio of related projects, or any team that shares resources across projects, Professional is the typical choice. The perpetual license model means the chosen edition stays available on each activated PC for the lifetime of the installation, with no monthly fees to manage and no auto-renewals to track.\u003c\/p\u003e\n\n\u003ch2\u003eCommon Workflows and Use Cases\u003c\/h2\u003e\n\u003cp\u003e\u003cstrong\u003eSoftware rollout planning.\u003c\/strong\u003e Project managers can use the built-in software rollout template, customise it for the specific release, and assign tasks to engineers, QA, and release managers. The Resource Manager view surfaces overallocation when two engineers are double-booked across the release and the next quarter's maintenance work, and the built-in leveling tool resolves the conflict by shifting the maintenance window. Status updates flow back from team members through the SharePoint task list, so the steering committee can see burndown and earned value analytics through the exported Excel and Power BI reports.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eConstruction and engineering coordination.\u003c\/strong\u003e For a multi-phase construction project, the resource pool holds the contractors, the equipment, and the shared on-site staff. The Team Planner view arranges the schedule by person, so the project manager can see who is on site, who is on the road, and who is overallocated for the week. Task Path highlighting surfaces the critical path, which is essential when a delay in the foundation phase cascades into every subsequent trade. Reporting is exported to PowerPoint for the weekly client update and to Excel for the cost reconciliation that the finance team runs at the end of the month.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eConsulting engagement management.\u003c\/strong\u003e A consulting firm can use a single .mpp file per engagement, with a shared resource pool that holds the partners, the senior consultants, and the staff. The SharePoint task list integration captures timesheets and status updates directly from team members, and the rate tables calculate the engagement margin as work is logged. Inactive tasks let the firm model what-if scenarios for the next quarter's pipeline without disturbing the live engagements.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eMarketing and event delivery.\u003c\/strong\u003e A marketing team running a campaign or an event delivery team running a conference can keep the master Gantt chart in Project and use the timeline view above the Gantt chart to present a clean executive roadmap to stakeholders. The Kanban-style board view (in \u003ca href=\"\/products\/microsoft-project-2021-professional-retail-2-pc\"\u003eProject 2021 Professional\u003c\/a\u003e and later) is the right tool for the daily standup, and the SharePoint task list sync keeps every contributor aligned without requiring them to open Project themselves.\u003c\/p\u003e\n\n\u003ch2\u003eSystem Requirements\u003c\/h2\u003e\n\u003ctable\u003e\n  \u003cthead\u003e\n    \u003ctr\u003e\n\u003cth\u003eComponent\u003c\/th\u003e\n\u003cth\u003eMinimum\u003c\/th\u003e\n\u003cth\u003eRecommended\u003c\/th\u003e\n\u003c\/tr\u003e\n  \u003c\/thead\u003e\n  \u003ctbody\u003e\n    \u003ctr\u003e\n\u003ctd\u003eOperating system\u003c\/td\u003e\n\u003ctd\u003eWindows 10 (32-bit or 64-bit), Windows Server 2016, Windows Server 2019\u003c\/td\u003e\n\u003ctd\u003eWindows 10 or Windows 11 (64-bit) with the latest cumulative updates\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eProcessor\u003c\/td\u003e\n\u003ctd\u003e1.6 GHz or faster, 2-core\u003c\/td\u003e\n\u003ctd\u003e2.0 GHz or faster, multi-core\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eMemory (RAM)\u003c\/td\u003e\n\u003ctd\u003e2 GB (32-bit) or 4 GB (64-bit)\u003c\/td\u003e\n\u003ctd\u003e8 GB for projects with resource pools and large .mpp files\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eHard disk space\u003c\/td\u003e\n\u003ctd\u003e4.0 GB available\u003c\/td\u003e\n\u003ctd\u003eSSD with 8 GB or more free for project files and backups\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eDisplay\u003c\/td\u003e\n\u003ctd\u003e1280 × 768 or higher resolution\u003c\/td\u003e\n\u003ctd\u003e1920 × 1080 or higher with DirectX 10 graphics\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eInternet\u003c\/td\u003e\n\u003ctd\u003eRequired for activation, optional for product use\u003c\/td\u003e\n\u003ctd\u003eBroadband for SharePoint sync and Office Add-in marketplace\u003c\/td\u003e\n\u003c\/tr\u003e\n  \u003c\/tbody\u003e\n\u003c\/table\u003e\n\n\u003ch2\u003eActivation and Licensing Notes\u003c\/h2\u003e\n\u003cp\u003eThe 2PC Retail Online key is a perpetual license for Microsoft Project 2019 Professional on two Windows PCs. The key is bound to the installation, not to a Microsoft account. Each PC can be reactivated after a reinstall using the same key. There is no upgrade entitlement: a separate license is required to move to \u003ca href=\"\/products\/microsoft-project-2021-professional-retail-5-pc\"\u003eProject 2021 Professional\u003c\/a\u003e or \u003ca href=\"\/products\/microsoft-project-2024-professional-bind-1-pc\"\u003eProject 2024 Professional\u003c\/a\u003e\u003c\/p\u003e\n\u003cp\u003eProject 2019 Professional is supported on Windows 10 and on Windows 11. It can be installed side by side with the Office 365 apps from a Microsoft 365 plan without conflict, provided the .mpp file association is set explicitly. For organisations that want the same Professional capability on a third device, the 5PC Retail Online variant of Project 2019 Professional is the right step.\u003c\/p\u003e\n\n\u003ch2\u003eGet Started With Microsoft Project 2019 Professional\u003c\/h2\u003e\n\u003cp\u003eDownload the Project 2019 Professional installer from the Microsoft volume licensing center or a trusted source, enter your 2PC product key on each workstation, and follow the activation wizard. The Microsoft Project 2019 Quick Start guide covers the most common project, resource, and reporting workflows. With a perpetual license, your team has Professional-grade project management capability on two Windows PCs for as long as each installation remains in service.\u003c\/p\u003e\u003ch2\u003eMicrosoft Project 2019 Professional Alternatives\u003c\/h2\u003e\n\u003cp\u003eThree credible alternatives cover most project management workloads.\u003c\/p\u003e\n\u003ch3\u003eMicrosoft Project Online (subscription)\u003c\/h3\u003e\u003cp\u003eCloud-based project management with Power BI reporting, resource engagement, and roadmap features. Best fit for organisations already on the Microsoft 365 platform.\u003c\/p\u003e\u003ch3\u003eAsana\u003c\/h3\u003e\u003cp\u003eModern work management platform with portfolios, goals, and timeline views. Strong fit for cross-functional teams that need both project and task tracking.\u003c\/p\u003e\u003ch3\u003eMonday.com or ClickUp\u003c\/h3\u003e\u003cp\u003eHighly configurable work management platforms with Gantt chart views, automations, and integrations. Best fit for teams that want a single tool for projects, tasks, and CRM-style work.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHow to choose:\u003c\/strong\u003e Stay on Project desktop if you need deep resource management, enterprise project types, and integration with the rest of the Microsoft platform. Choose Project Online for cloud access and Power BI reporting. Choose Asana or Monday if you need a flexible work management tool that goes beyond project scheduling.\u003c\/p\u003e\n\n\u003ch2\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eCan the two PCs be in different offices or countries?\u003c\/summary\u003e\n  \u003cp\u003eYes. The 2PC license is counted per device, not per user or per location. As long as the total number of activated PCs does not exceed two, the key can be used across multiple users, sites, and countries.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eWhat happens if I need to replace one of the two PCs?\u003c\/summary\u003e\n  \u003cp\u003eDeactivate the existing installation from inside Project (File \u0026gt; Account \u0026gt; Deactivate) or uninstall the application, then install and reactivate on the new PC using the same key. The activation count is decremented automatically when the deactivation is registered online.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eDoes Project 2019 Professional work with Project Online or Project Server?\u003c\/summary\u003e\n  \u003cp\u003eProject 2019 Professional can connect to Project Server 2019 on premises for centralised resource pools, timesheets, and portfolio analysis. Project Online is now part of Microsoft Planner, Project Online, and the new Project for the web service, and Project 2019 Professional can read and write data through the Project Online Desktop Client add-on when a qualifying subscription is in place.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eIs there a Project 2019 Standard license available for the rest of the team?\u003c\/summary\u003e\n  \u003cp\u003eYes. The \u003ca href=\"\/products\/microsoft-project-2019-standard-retail-5-pc\"\u003eProject 2019 Standard\u003c\/a\u003e 5PC Retail Online license is the right option for team members who only need basic Gantt charts, task lists, and reporting without the resource pool, Team Planner, and SharePoint sync that the Professional edition provides.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eDoes this license include a free upgrade to Project 2021 or 2024?\u003c\/summary\u003e\n  \u003cp\u003eNo. Project 2019 Professional is sold as a perpetual license for that version specifically. To upgrade, a new license for the newer version must be purchased. The .mpp file format remains compatible across releases, so existing plans open directly in Project 2021 or 2024 once the new license is installed.\u003c\/p\u003e\n\u003c\/details\u003e\n\n","brand":"Microsoft","offers":[{"title":"Default Title","offer_id":59850908303441,"sku":"MS-047-MICROSOFT-PROJECT-2019-PROFESSIONAL-RETA","price":9.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1059\/0191\/6241\/files\/microsoft-project-2019-professional-retail-2-pc.webp?v=1784725520"},{"product_id":"microsoft-project-2019-professional-retail-5-pc","title":"Microsoft Project 2019 Professional Retail [5 PC]","description":"\u003ch2\u003eMicrosoft Project 2019 Professional for a Small PMO Team\u003c\/h2\u003e\n\u003cp\u003e\u003ca href=\"\/products\/microsoft-project-2019-professional-retail-5-pc\"\u003eMicrosoft Project 2019 Professional\u003c\/a\u003e is the desktop project and portfolio management application that gives a small PMO team the resource pool, multi-project coordination, and SharePoint task list integration that the Standard edition does not provide. The 2019 release introduces a modernised ribbon, dark mode, improved accessibility, and timeline bar labels that show progress directly on the Gantt chart. The 5PC Retail Online license is designed for a project manager and four team members, or for a project management team that needs Professional-grade capability on every workstation. Activation is a clean one-time step on each of the five Windows PCs, with no subscription portal to manage and no monthly usage fees — the same resource pool, multi-project coordination, and SharePoint task list sync stay available on every workstation for the lifetime of the desktop application. Every key is sourced directly from Microsoft authorized channels and delivered to your account dashboard the moment your payment clears, so activation goes through cleanly without invalid-key errors and the same key reactivates after a clean reinstall or hardware change. Standard covers the core Gantt, scheduling, and reporting tools; Professional adds the resource pool, Team Planner, and SharePoint task list sync for multi-project coordination, so double-check the edition on the title before checkout. 📋 📅 ⏱️\u003c\/p\u003e\n\n\u003ch2\u003eWhat Is Included and How Activation Works\u003c\/h2\u003e\n\u003cp\u003eYour 5PC Retail Online license includes one Microsoft \u003ca href=\"\/products\/microsoft-project-2019-professional-retail-2-pc\"\u003eProject 2019 Professional\u003c\/a\u003e product key that activates the application on up to five Windows PCs. The license is perpetual, so there are no subscription fees to manage. The same key can be used to reactivate \u003ca href=\"\/products\/microsoft-project-2019-standard-retail-5-pc\"\u003eProject 2019 Standard\u003c\/a\u003e Professional on the same PCs after a clean reinstall of the operating system or after a hardware refresh.\u003c\/p\u003e\n\u003cp\u003eTo activate, run the Microsoft \u003ca href=\"\/products\/microsoft-project-2016-professional-retail-5-pc\"\u003eProject 2016 Professional\u003c\/a\u003e 2019 Professional installer on each Windows PC, enter the 25-character product key when prompted, and complete the online activation against the Microsoft activation service. An internet connection is required only for activation and for downloading updates; the application itself runs entirely offline once activated.\u003c\/p\u003e\n\n\u003ch2\u003eKey Features and Capabilities\u003c\/h2\u003e\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eModern Office 2019 ribbon and dark mode\u003c\/strong\u003e — the Fluent design language aligns \u003ca href=\"\/products\/microsoft-project-2013-professional-retail-5-pc\"\u003eProject 2013 Professional\u003c\/a\u003e 2019 with the rest of the Office 2019 family, and dark mode reduces eye strain for project managers who spend long hours in the application.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePre-built Gantt charts and templates\u003c\/strong\u003e — start a project in minutes with templates for software rollouts, construction, marketing campaigns, and event delivery; timelines are presented alongside the Gantt chart.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eResource Manager and resource pools\u003c\/strong\u003e — centralise people, equipment, and material resources across multiple .mpp files; identify over-allocations and run leveling to resolve them automatically.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTask Path highlighting\u003c\/strong\u003e — visualise the chain of predecessors and successors for any selected task; the critical path is rendered in red so at-risk work is visible at a glance.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTeam Planner view\u003c\/strong\u003e — a swim-lane view that arranges work by team member, surfaces scheduling conflicts side by side, and lets the project manager drag and drop tasks to rebalance the team.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTimeline bar labels\u003c\/strong\u003e — a \u003ca href=\"\/products\/microsoft-project-2010-professional-retail-5-pc\"\u003eProject 2010 Professional\u003c\/a\u003e 2019 addition that shows task progress directly on the Gantt chart, removing the need to switch into a separate view to check status.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eResource capacity heat maps\u003c\/strong\u003e — visualise overallocation, under-utilisation, and bench time across the team in a single colour-coded report.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eSharePoint task list sync\u003c\/strong\u003e — publish project tasks to SharePoint so team members can update progress from a modern browser; changes are pulled back into the master plan.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eAccessibility upgrades\u003c\/strong\u003e — improved keyboard navigation, zoomable reports, and integrated Narrator support make the application more usable for project managers with visual or motor accessibility needs.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eOffice Add-in platform support\u003c\/strong\u003e — read\/write access for Office Add-ins lets custom or third-party tools interact with project data, schedules, and resources.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eWho This Edition Is For\u003c\/h2\u003e\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eSmall PMO teams\u003c\/strong\u003e running a portfolio of related projects that share resources and need consolidated status reporting through SharePoint on five workstations.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIT and engineering project leads\u003c\/strong\u003e standardising on the Office 2019 generation and needing Professional-grade resource and reporting tools on every team member's PC.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eConstruction and engineering coordinators\u003c\/strong\u003e managing contractors, internal staff, and equipment across multiple job sites with shared resource pools and capacity heat maps.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eConsulting and professional services firms\u003c\/strong\u003e that need five perpetual Project Professional licenses for the delivery team without committing to a Microsoft 365 subscription.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eStandard vs Professional: What Project Adds\u003c\/h2\u003e\n\u003cp\u003eProject Standard is the core project management application: Gantt charts, scheduling, dependencies, milestones, calendars, and built-in reporting. Project Professional adds the features that an organisation needs when it has more than one project running at a time, when it shares resources across teams, or when it wants a tighter collaboration path with SharePoint. The Resource Manager view and the resource pool workflow are the most visible additions, because they let a project manager coordinate shared people and equipment across multiple .mpp files. Team Planner is another Professional-only view, arranging work by team member so that conflicts and over-allocations are easy to see at a glance. SharePoint task list sync, the Office Add-in platform with read\/write access to project data, and the additional Office integration paths round out the collaboration story that the Standard edition does not provide.\u003c\/p\u003e\n\u003cp\u003eFor a single user running a single project, Standard is the right fit and the lower-cost option. For a PMO, a portfolio of related projects, or any team that shares resources across projects, Professional is the typical choice. The perpetual license model means the chosen edition stays available on each activated PC for the lifetime of the installation, with no monthly fees to manage and no auto-renewals to track.\u003c\/p\u003e\n\n\u003ch2\u003eCommon Workflows and Use Cases\u003c\/h2\u003e\n\u003cp\u003e\u003cstrong\u003eSoftware rollout planning.\u003c\/strong\u003e Project managers can use the built-in software rollout template, customise it for the specific release, and assign tasks to engineers, QA, and release managers. The Resource Manager view surfaces overallocation when two engineers are double-booked across the release and the next quarter's maintenance work, and the built-in leveling tool resolves the conflict by shifting the maintenance window. Status updates flow back from team members through the SharePoint task list, so the steering committee can see burndown and earned value analytics through the exported Excel and Power BI reports.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eConstruction and engineering coordination.\u003c\/strong\u003e For a multi-phase construction project, the resource pool holds the contractors, the equipment, and the shared on-site staff. The Team Planner view arranges the schedule by person, so the project manager can see who is on site, who is on the road, and who is overallocated for the week. Task Path highlighting surfaces the critical path, which is essential when a delay in the foundation phase cascades into every subsequent trade. Reporting is exported to PowerPoint for the weekly client update and to Excel for the cost reconciliation that the finance team runs at the end of the month.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eConsulting engagement management.\u003c\/strong\u003e A consulting firm can use a single .mpp file per engagement, with a shared resource pool that holds the partners, the senior consultants, and the staff. The SharePoint task list integration captures timesheets and status updates directly from team members, and the rate tables calculate the engagement margin as work is logged. Inactive tasks let the firm model what-if scenarios for the next quarter's pipeline without disturbing the live engagements.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eMarketing and event delivery.\u003c\/strong\u003e A marketing team running a campaign or an event delivery team running a conference can keep the master Gantt chart in Project and use the timeline view above the Gantt chart to present a clean executive roadmap to stakeholders. The Kanban-style board view (in \u003ca href=\"\/products\/microsoft-project-2021-professional-retail-2-pc\"\u003eProject 2021 Professional\u003c\/a\u003e and later) is the right tool for the daily standup, and the SharePoint task list sync keeps every contributor aligned without requiring them to open Project themselves.\u003c\/p\u003e\n\n\u003ch2\u003eSystem Requirements\u003c\/h2\u003e\n\u003ctable\u003e\n  \u003cthead\u003e\n    \u003ctr\u003e\n\u003cth\u003eComponent\u003c\/th\u003e\n\u003cth\u003eMinimum\u003c\/th\u003e\n\u003cth\u003eRecommended\u003c\/th\u003e\n\u003c\/tr\u003e\n  \u003c\/thead\u003e\n  \u003ctbody\u003e\n    \u003ctr\u003e\n\u003ctd\u003eOperating system\u003c\/td\u003e\n\u003ctd\u003eWindows 10 (32-bit or 64-bit), Windows Server 2016, Windows Server 2019\u003c\/td\u003e\n\u003ctd\u003eWindows 10 or Windows 11 (64-bit) with the latest cumulative updates\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eProcessor\u003c\/td\u003e\n\u003ctd\u003e1.6 GHz or faster, 2-core\u003c\/td\u003e\n\u003ctd\u003e2.0 GHz or faster, multi-core\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eMemory (RAM)\u003c\/td\u003e\n\u003ctd\u003e2 GB (32-bit) or 4 GB (64-bit)\u003c\/td\u003e\n\u003ctd\u003e8 GB for projects with resource pools and large .mpp files\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eHard disk space\u003c\/td\u003e\n\u003ctd\u003e4.0 GB available\u003c\/td\u003e\n\u003ctd\u003eSSD with 8 GB or more free for project files and backups\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eDisplay\u003c\/td\u003e\n\u003ctd\u003e1280 × 768 or higher resolution\u003c\/td\u003e\n\u003ctd\u003e1920 × 1080 or higher with DirectX 10 graphics\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eInternet\u003c\/td\u003e\n\u003ctd\u003eRequired for activation, optional for product use\u003c\/td\u003e\n\u003ctd\u003eBroadband for SharePoint sync and Office Add-in marketplace\u003c\/td\u003e\n\u003c\/tr\u003e\n  \u003c\/tbody\u003e\n\u003c\/table\u003e\n\n\u003ch2\u003eActivation and Licensing Notes\u003c\/h2\u003e\n\u003cp\u003eThe 5PC Retail Online key is a perpetual license for Microsoft Project 2019 Professional on five Windows PCs. The key is bound to the installation, not to a Microsoft account. Each PC can be reactivated after a reinstall using the same key. There is no upgrade entitlement: a separate license is required to move to \u003ca href=\"\/products\/microsoft-project-2021-professional-retail-5-pc\"\u003eProject 2021 Professional\u003c\/a\u003e or \u003ca href=\"\/products\/microsoft-project-2024-professional-bind-1-pc\"\u003eProject 2024 Professional\u003c\/a\u003e\u003c\/p\u003e\n\u003cp\u003eProject 2019 Professional is supported on Windows 10 and on Windows 11. The 64-bit install is recommended for projects that exceed 5,000 tasks or that work with multiple resource pools, because the larger address space improves performance noticeably. For deployments that include SharePoint task list sync, the SharePoint 2019 server environment must be available on the network.\u003c\/p\u003e\n\n\u003ch2\u003eGet Started With Microsoft Project 2019 Professional\u003c\/h2\u003e\n\u003cp\u003eDownload the Project 2019 Professional installer from the Microsoft volume licensing center or a trusted source, enter your 5PC product key on each workstation, and follow the activation wizard. The Microsoft Project 2019 Quick Start guide covers the most common project, resource, and reporting workflows. With a perpetual license, your PMO team has Professional-grade project management capability on five Windows PCs for as long as each installation remains in service.\u003c\/p\u003e\u003ch2\u003eMicrosoft Project 2019 Professional Alternatives\u003c\/h2\u003e\n\u003cp\u003eThree credible alternatives cover most project management workloads.\u003c\/p\u003e\n\u003ch3\u003eMicrosoft Project Online (subscription)\u003c\/h3\u003e\u003cp\u003eCloud-based project management with Power BI reporting, resource engagement, and roadmap features. Best fit for organisations already on the Microsoft 365 platform.\u003c\/p\u003e\u003ch3\u003eAsana\u003c\/h3\u003e\u003cp\u003eModern work management platform with portfolios, goals, and timeline views. Strong fit for cross-functional teams that need both project and task tracking.\u003c\/p\u003e\u003ch3\u003eMonday.com or ClickUp\u003c\/h3\u003e\u003cp\u003eHighly configurable work management platforms with Gantt chart views, automations, and integrations. Best fit for teams that want a single tool for projects, tasks, and CRM-style work.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHow to choose:\u003c\/strong\u003e Stay on Project desktop if you need deep resource management, enterprise project types, and integration with the rest of the Microsoft platform. Choose Project Online for cloud access and Power BI reporting. Choose Asana or Monday if you need a flexible work management tool that goes beyond project scheduling.\u003c\/p\u003e\n\n\u003ch2\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eCan the five PCs be split across different teams or regions?\u003c\/summary\u003e\n  \u003cp\u003eYes. The 5PC license is counted per device, not per user, team, or region. As long as the total number of activated PCs does not exceed five, the key can be used across multiple users, sites, and countries.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eDoes Project 2019 Professional integrate with Microsoft Teams?\u003c\/summary\u003e\n  \u003cp\u003eNative Project and Roadmap apps in Microsoft Teams are designed for Project for the web and Project Online, not for the Project 2019 Professional desktop application. For Teams collaboration, the recommended pattern is to publish project tasks to a SharePoint task list that is then added as a tab in a Teams channel, so updates flow between the two systems.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eCan the 5PC license be split into 1PC and 4PC variants?\u003c\/summary\u003e\n  \u003cp\u003eNo. The 5PC key activates on five PCs as a single license. If your team needs a different distribution, the 1PC BIND and 2PC Retail Online variants of Project 2019 Professional are available separately.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eWhat happens to my plans if I switch to Project 2021 or 2024?\u003c\/summary\u003e\n  \u003cp\u003eThe .mpp file format is forward-compatible. Project 2021 and \u003ca href=\"\/products\/microsoft-project-2024-standard-bind-1-pc\"\u003eProject 2024 Standard\u003c\/a\u003e open plans created in Project 2019 without conversion. Once the new license is installed, the existing plans are loaded directly and all custom fields, baselines, and resource data remain intact.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eIs Project Server 2019 required for the Professional features?\u003c\/summary\u003e\n  \u003cp\u003eNo. The resource pool, Team Planner, and SharePoint task list sync features work without Project Server, using shared .mpp files on a network share or a SharePoint document library. Project Server 2019 adds centralised demand management, portfolio analysis, and the enterprise timesheet workflow, but is not required for the day-to-day Professional features.\u003c\/p\u003e\n\u003c\/details\u003e\n\n","brand":"Microsoft","offers":[{"title":"Default Title","offer_id":59850908368977,"sku":"MS-048-MICROSOFT-PROJECT-2019-PROFESSIONAL-RETA","price":14.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1059\/0191\/6241\/files\/microsoft-project-2019-professional-retail-5-pc.webp?v=1784725521"},{"product_id":"microsoft-project-2019-standard-retail-5-pc","title":"Microsoft Project 2019 Standard Retail [5 PC]","description":"\u003ch2\u003eMicrosoft Project 2019 Standard for Core Project Planning\u003c\/h2\u003e\n\u003cp\u003e\u003ca href=\"\/products\/microsoft-project-2019-standard-retail-5-pc\"\u003eMicrosoft Project 2019 Standard\u003c\/a\u003e is the desktop project management application for project managers, coordinators, and individual contributors who need the core Gantt chart, scheduling, and reporting capabilities without the resource pool, Team Planner, and SharePoint task list sync that the Professional edition adds. The 2019 release introduces a modernised ribbon, dark mode, improved accessibility, and timeline bar labels that show progress directly on the Gantt chart. The 5PC Retail Online license is designed for a project team that runs single, well-scoped projects and needs a perpetual desktop tool for every member. Activation is a clean one-time step on each of the five Windows PCs, with no subscription portal to manage and no monthly usage fees — the same Gantt, scheduling, and reporting tools stay available on every workstation for the lifetime of the desktop application. Every key is sourced directly from Microsoft authorized channels and delivered to your account dashboard the moment your payment clears, so activation goes through cleanly without invalid-key errors and the same key reactivates after a clean reinstall or hardware change. Standard covers the core Gantt, scheduling, and reporting tools; Professional adds the resource pool, Team Planner, and SharePoint task list sync for multi-project coordination, so double-check the edition on the title before checkout. 📋 📅 ⏱️\u003c\/p\u003e\n\n\u003ch2\u003eWhat Is Included and How Activation Works\u003c\/h2\u003e\n\u003cp\u003eYour 5PC Retail Online license includes one Microsoft \u003ca href=\"\/products\/microsoft-project-2013-professional-retail-5-pc\"\u003eProject 2013 Professional\u003c\/a\u003e 2019 Standard product key that activates the application on up to five Windows PCs. The license is perpetual, so there are no subscription fees to manage. The same key can be used to reactivate \u003ca href=\"\/products\/microsoft-project-2010-professional-retail-5-pc\"\u003eProject 2010 Professional\u003c\/a\u003e 2019 Standard on the same PCs after a clean reinstall of the operating system or after a hardware refresh.\u003c\/p\u003e\n\u003cp\u003eTo activate, run the Microsoft Project 2019 Standard installer on each Windows PC, enter the 25-character product key when prompted, and complete the online activation against the Microsoft activation service. An internet connection is required only for activation and for downloading updates; the application itself runs entirely offline once activated.\u003c\/p\u003e\n\n\u003ch2\u003eKey Features and Capabilities\u003c\/h2\u003e\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eModern Office 2019 ribbon and dark mode\u003c\/strong\u003e — the Fluent design language aligns Project 2019 with the rest of the Office 2019 family, and dark mode reduces eye strain for project managers who spend long hours in the application.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePre-built Gantt charts and templates\u003c\/strong\u003e — start a project in minutes with templates for software rollouts, construction, marketing campaigns, and event delivery; timelines are presented alongside the Gantt chart.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTask dependencies and critical path\u003c\/strong\u003e — define finish-to-start, start-to-start, finish-to-finish, and start-to-finish dependencies with lead and lag; the critical path is rendered in red so at-risk work is visible at a glance.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eMilestones and deadlines\u003c\/strong\u003e — mark key delivery points and contractual dates; the application surfaces them on the timeline view for stakeholder reporting.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eBuilt-in reports\u003c\/strong\u003e — generate pre-built reports on project overview, cost overview, work overview, upcoming tasks, and task costing without manual report design.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eCustomisable calendars\u003c\/strong\u003e — model shifts, holidays, and time-off windows; apply calendars at the project, task, or resource level to reflect real working time.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTimeline bar labels\u003c\/strong\u003e — a Project 2019 addition that shows task progress directly on the Gantt chart, removing the need to switch into a separate view to check status.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eAccessibility upgrades\u003c\/strong\u003e — improved keyboard navigation, zoomable reports, and integrated Narrator support make the application more usable for project managers with visual or motor accessibility needs.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eOffice Add-in platform support\u003c\/strong\u003e — read\/write access for Office Add-ins lets custom or third-party tools interact with project data, schedules, and resources.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eExport to PowerPoint, Excel, and PDF\u003c\/strong\u003e — produce executive-friendly reports and dashboards for steering committees and stakeholders.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eWho This Edition Is For\u003c\/h2\u003e\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eProject managers and coordinators\u003c\/strong\u003e who need the core Gantt chart, scheduling, and reporting capabilities on five Windows PCs without paying for the Professional features they do not use.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIT and engineering team leads\u003c\/strong\u003e running single, well-scoped projects with a defined scope and a stable team.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eMarketing and event project managers\u003c\/strong\u003e who need a perpetual desktop project management tool for campaigns that do not share resources across portfolios.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eSmall businesses and consultancies\u003c\/strong\u003e that need a perpetual project management tool for the team and prefer the simpler Standard feature set.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eStandard vs Professional: When Standard Is the Right Fit\u003c\/h2\u003e\n\u003cp\u003eProject Standard includes the core project management application: Gantt charts, scheduling, dependencies, milestones, calendars, built-in reports, and the modernised Office user experience. Project Professional adds the features that an organisation needs when it has more than one project running at a time, when it shares resources across teams, or when it wants a tighter collaboration path with SharePoint. The Resource Manager view and the resource pool workflow, the Team Planner view, the SharePoint task list sync, and the Office Add-in read\/write access to project data are the most visible additions that the Standard edition does not provide.\u003c\/p\u003e\n\u003cp\u003eFor a single user running a single project, or for a small team running well-scoped projects with a stable resource pool, Standard is the right fit and the lower-cost option. For a PMO, a portfolio of related projects, or any team that shares resources across projects, Professional is the typical choice. The perpetual license model means the chosen edition stays available on each activated PC for the lifetime of the installation, with no monthly fees to manage and no auto-renewals to track.\u003c\/p\u003e\n\n\u003ch2\u003eCommon Workflows and Use Cases\u003c\/h2\u003e\n\u003cp\u003e\u003cstrong\u003eSoftware rollout planning.\u003c\/strong\u003e Project managers can use the built-in software rollout template, customise it for the specific release, and assign tasks to engineers, QA, and release managers. Task Path highlighting surfaces the critical path, and the built-in reports on project overview, cost overview, and work overview keep the steering committee informed.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eMarketing campaign tracking.\u003c\/strong\u003e A marketing team can keep the master Gantt chart in Project, use the timeline view above the Gantt chart to present a clean executive roadmap, and export the schedule to PowerPoint for the campaign kickoff. Milestones mark the key campaign dates, and the built-in reports keep the team aligned.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eEvent delivery.\u003c\/strong\u003e An event delivery team running a conference can use the built-in event template, customise it for the specific event, and use the multiple timelines (in Project 2021 and later) to show executive and operational views of the same plan. The Kanban-style board view (in Project 2021 and later) is the right tool for the daily standup, and the Gantt chart is the right tool for the weekly steering committee review.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eConstruction and small engineering work.\u003c\/strong\u003e A small construction or engineering team can use the built-in construction template, customise it for the specific project, and use the critical path analysis to identify the tasks that drive the schedule. The customisable calendars handle shifts, holidays, and time-off, and the rate tables calculate the cost as work is logged.\u003c\/p\u003e\n\n\u003ch2\u003eSystem Requirements\u003c\/h2\u003e\n\u003ctable\u003e\n  \u003cthead\u003e\n    \u003ctr\u003e\n\u003cth\u003eComponent\u003c\/th\u003e\n\u003cth\u003eMinimum\u003c\/th\u003e\n\u003cth\u003eRecommended\u003c\/th\u003e\n\u003c\/tr\u003e\n  \u003c\/thead\u003e\n  \u003ctbody\u003e\n    \u003ctr\u003e\n\u003ctd\u003eOperating system\u003c\/td\u003e\n\u003ctd\u003eWindows 10 (32-bit or 64-bit), Windows Server 2016, Windows Server 2019\u003c\/td\u003e\n\u003ctd\u003eWindows 10 or Windows 11 (64-bit) with the latest cumulative updates\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eProcessor\u003c\/td\u003e\n\u003ctd\u003e1.6 GHz or faster, 2-core\u003c\/td\u003e\n\u003ctd\u003e2.0 GHz or faster, multi-core\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eMemory (RAM)\u003c\/td\u003e\n\u003ctd\u003e2 GB (32-bit) or 4 GB (64-bit)\u003c\/td\u003e\n\u003ctd\u003e8 GB for projects with large .mpp files or many subprojects\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eHard disk space\u003c\/td\u003e\n\u003ctd\u003e4.0 GB available\u003c\/td\u003e\n\u003ctd\u003eSSD with 8 GB or more free for project files and backups\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eDisplay\u003c\/td\u003e\n\u003ctd\u003e1280 × 768 or higher resolution\u003c\/td\u003e\n\u003ctd\u003e1920 × 1080 or higher with DirectX 10 graphics\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eInternet\u003c\/td\u003e\n\u003ctd\u003eRequired for activation, optional for product use\u003c\/td\u003e\n\u003ctd\u003eBroadband for Office Add-in marketplace and updates\u003c\/td\u003e\n\u003c\/tr\u003e\n  \u003c\/tbody\u003e\n\u003c\/table\u003e\n\n\u003ch2\u003eActivation and Licensing Notes\u003c\/h2\u003e\n\u003cp\u003eThe 5PC Retail Online key is a perpetual license for Microsoft Project 2019 Standard on five Windows PCs. The key is bound to the installation, not to a Microsoft account. Each PC can be reactivated after a reinstall using the same key. There is no upgrade entitlement: a separate license is required to move to Project Professional 2019, Project 2021, or \u003ca href=\"\/products\/microsoft-project-2024-standard-bind-1-pc\"\u003eProject 2024 Standard\u003c\/a\u003e\u003c\/p\u003e\n\u003cp\u003eProject 2019 Standard is supported on Windows 10 and on Windows 11. Plans created in Project 2019 Standard open in Project Professional 2019 and in Project 2021 \/ 2024. If a project grows to need a shared resource pool or SharePoint task list sync, the team can move to \u003ca href=\"\/products\/microsoft-project-2019-professional-bind-1-pc\"\u003eProject 2019 Professional\u003c\/a\u003e or to \u003ca href=\"\/products\/microsoft-project-2021-professional-retail-2-pc\"\u003eProject 2021 Professional\u003c\/a\u003e and the existing .mpp files will load with all task data intact.\u003c\/p\u003e\n\n\u003ch2\u003eGet Started With Microsoft Project 2019 Standard\u003c\/h2\u003e\n\u003cp\u003eDownload the Project 2019 Standard installer from the Microsoft volume licensing center or a trusted source, enter your 5PC product key on each workstation, and follow the activation wizard. The Microsoft Project 2019 Quick Start guide covers the most common project, scheduling, and reporting workflows. With a perpetual license, your team has a stable, professionally supported project management tool on five Windows PCs for as long as each installation remains in service.\u003c\/p\u003e\u003ch2\u003eMicrosoft Project 2019 Standard Alternatives\u003c\/h2\u003e\n\u003cp\u003eThree credible alternatives cover most project management workloads.\u003c\/p\u003e\n\u003ch3\u003eMicrosoft Project Online (subscription)\u003c\/h3\u003e\u003cp\u003eCloud-based project management with Power BI reporting, resource engagement, and roadmap features. Best fit for organisations already on the Microsoft 365 platform.\u003c\/p\u003e\u003ch3\u003eAsana\u003c\/h3\u003e\u003cp\u003eModern work management platform with portfolios, goals, and timeline views. Strong fit for cross-functional teams that need both project and task tracking.\u003c\/p\u003e\u003ch3\u003eMonday.com or ClickUp\u003c\/h3\u003e\u003cp\u003eHighly configurable work management platforms with Gantt chart views, automations, and integrations. Best fit for teams that want a single tool for projects, tasks, and CRM-style work.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHow to choose:\u003c\/strong\u003e Stay on Project desktop if you need deep resource management, enterprise project types, and integration with the rest of the Microsoft platform. Choose Project Online for cloud access and Power BI reporting. Choose Asana or Monday if you need a flexible work management tool that goes beyond project scheduling.\u003c\/p\u003e\n\n\u003ch2\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eWhat is the difference between Project 2019 Standard and Project 2019 Professional?\u003c\/summary\u003e\n  \u003cp\u003eProject 2019 Standard is the core project management application: Gantt charts, scheduling, dependencies, milestones, calendars, and built-in reports. \u003ca href=\"\/products\/microsoft-project-2019-professional-retail-2-pc\"\u003eProject 2019 Professional\u003c\/a\u003e adds resource pools, Team Planner, SharePoint task list sync, Skype for Business presence, and the additional Office Add-in capabilities that the Professional edition unlocks. For a small team running single projects, Standard is the right choice; for a PMO running a portfolio, Professional is the typical fit.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eCan Project 2019 Standard read plans created in Project 2019 Professional?\u003c\/summary\u003e\n  \u003cp\u003eYes. The .mpp file format is shared between Standard and Professional. Project 2019 Standard reads plans created in \u003ca href=\"\/products\/microsoft-project-2019-professional-retail-5-pc\"\u003eProject 2019 Professional,\u003c\/a\u003e but it cannot edit the Professional-only features such as resource pool references. If a plan contains only Standard-compatible elements, both editions can edit it freely.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eDoes Project 2019 Standard include Skype for Business integration?\u003c\/summary\u003e\n  \u003cp\u003eSkype for Business presence can be surfaced inside the application, but the deeper integration that Project 2019 Professional provides — such as the Office Add-in read\/write access to project data — is not part of the Standard feature set.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eIs a Microsoft account or Microsoft 365 subscription required?\u003c\/summary\u003e\n  \u003cp\u003eNo. Project 2019 Standard is a fully installed desktop application. The Retail Online key activates the product without requiring a Microsoft 365 subscription. An internet connection is required for the activation step and for optional updates, but the application itself runs offline.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eCan the team move from Standard to Professional later?\u003c\/summary\u003e\n  \u003cp\u003eYes. A new Project 2019 Professional license can be installed on the same Windows PC, and the existing .mpp files will open in the Professional edition without conversion. The Standard and Professional editions cannot both be installed on the same PC at the same time, so the Standard license should be removed first.\u003c\/p\u003e\n\u003c\/details\u003e\n\n","brand":"Microsoft","offers":[{"title":"Default Title","offer_id":59850908565585,"sku":"MS-049-MICROSOFT-PROJECT-2019-STANDARD-RETAIL-5","price":14.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1059\/0191\/6241\/files\/microsoft-project-2019-standard-retail-5-pc.webp?v=1784725523"},{"product_id":"microsoft-project-2021-professional-retail-2-pc","title":"Microsoft Project 2021 Professional Retail [2 PC]","description":"\u003ch2\u003eMicrosoft Project 2021 Professional on Two Windows PCs\u003c\/h2\u003e\n\u003cp\u003e\u003ca href=\"\/products\/microsoft-project-2021-professional-retail-2-pc\"\u003eMicrosoft Project 2021 Professional\u003c\/a\u003e is the desktop project and portfolio management application for project managers who need the deeper resource and reporting tools that the Standard edition does not provide, paired with the modernised Office 2021 user experience. The 2021 release introduces a refreshed interface, dark mode, multiple timelines for executive roadmaps, Kanban-style board views for agile work, and tighter integration with Microsoft Teams and Power BI. The 2PC Retail Online license is the right fit for a project manager and a deputy, or for a project lead who alternates between a desktop and a laptop. Activation is a clean one-time step on each of the two Windows PCs, with no subscription portal to manage and no monthly usage fees — the modernised \u003ca href=\"\/products\/microsoft-project-2019-professional-bind-1-pc\"\u003eProject 2019 Professional\u003c\/a\u003e 2021 interface, multiple timelines, Kanban board views, and Power BI dashboards stay available on both installs for the lifetime of the desktop application. Every key is sourced directly from Microsoft authorized channels and delivered to your account dashboard the moment your payment clears, so activation goes through cleanly without invalid-key errors and the same key reactivates after a clean reinstall or hardware change. Standard covers the core Gantt, scheduling, and reporting tools; Professional adds the resource pool, Team Planner, and SharePoint task list sync for multi-project coordination, so double-check the edition on the title before checkout. 📋 ⏱️ 📅\u003c\/p\u003e\n\n\u003ch2\u003eWhat Is Included and How Activation Works\u003c\/h2\u003e\n\u003cp\u003eYour 2PC Retail Online license includes one Microsoft \u003ca href=\"\/products\/microsoft-project-2019-professional-retail-2-pc\"\u003eProject 2019 Professional\u003c\/a\u003e 2021 Professional product key that activates the application on up to two Windows PCs. The license is perpetual, so there are no subscription fees to manage. The same key can be used to reactivate \u003ca href=\"\/products\/microsoft-project-2019-professional-retail-5-pc\"\u003eProject 2019 Professional\u003c\/a\u003e 2021 Professional on the same PCs after a clean reinstall of the operating system or after a hardware refresh.\u003c\/p\u003e\n\u003cp\u003eTo activate, run the Microsoft \u003ca href=\"\/products\/microsoft-project-2016-professional-retail-5-pc\"\u003eProject 2016 Professional\u003c\/a\u003e 2021 Professional installer on each Windows PC, enter the 25-character product key when prompted, and complete the online activation against the Microsoft activation service. An internet connection is required only for activation and for downloading updates; the application itself runs entirely offline once activated.\u003c\/p\u003e\n\n\u003ch2\u003eKey Features and Capabilities\u003c\/h2\u003e\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eModern Office 2021 ribbon and dark mode\u003c\/strong\u003e — the Fluent design language aligns \u003ca href=\"\/products\/microsoft-project-2013-professional-retail-5-pc\"\u003eProject 2013 Professional\u003c\/a\u003e 2021 with the rest of the Office 2021 family, and dark mode reduces eye strain for project managers who spend long hours in the application.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePre-built Gantt charts and templates\u003c\/strong\u003e — start a project in minutes with templates for software rollouts, construction, marketing campaigns, and event delivery; timelines are presented alongside the Gantt chart.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eResource Manager and resource pools\u003c\/strong\u003e — centralise people, equipment, and material resources across multiple .mpp files; identify over-allocations and run leveling to resolve them automatically.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTask Path highlighting\u003c\/strong\u003e — visualise the chain of predecessors and successors for any selected task; the critical path is rendered in red so at-risk work is visible at a glance.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTeam Planner view\u003c\/strong\u003e — a swim-lane view that arranges work by team member, surfaces scheduling conflicts side by side, and lets the project manager drag and drop tasks to rebalance the team.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eMultiple timelines\u003c\/strong\u003e — present executive-friendly roadmaps and stage gate summaries above the Gantt chart for steering committee and stakeholder reviews.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eKanban-style board views\u003c\/strong\u003e — visualise agile workflows, limit work in progress, and track tasks through customisable columns such as To Do, Doing, and Done.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eSharePoint task list sync and Power BI\u003c\/strong\u003e — publish tasks to SharePoint for browser-based updates and surface project metrics through Power BI dashboards.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eResource capacity heat maps\u003c\/strong\u003e — visualise overallocation, under-utilisation, and bench time across the team in a single colour-coded report.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePerformance and accessibility improvements\u003c\/strong\u003e — faster file open and save, smoother interaction on large plans, improved keyboard navigation, and better screen reader support.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eWho This Edition Is For\u003c\/h2\u003e\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003e\u003ca href=\"\/products\/microsoft-project-2010-professional-retail-5-pc\"\u003eProject 2010 Professional\u003c\/a\u003e managers with a deputy\u003c\/strong\u003e who both need Professional-grade resource and reporting tools on a dedicated Windows PC with the modern Office 2021 look and feel.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003e\u003ca href=\"\/products\/microsoft-project-2019-standard-retail-5-pc\"\u003eProject 2019 Standard\u003c\/a\u003e leads\u003c\/strong\u003e who alternate between a desktop workstation and a laptop, and need the same Professional capability on both devices.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eSmall PMO teams\u003c\/strong\u003e running a portfolio of related projects that share resources and need consolidated status reporting through SharePoint and Power BI.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eAgile-leaning project teams\u003c\/strong\u003e that need Kanban-style board views alongside the traditional Gantt chart for hybrid planning.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eStandard vs Professional: What Project Adds\u003c\/h2\u003e\n\u003cp\u003eProject Standard is the core project management application: Gantt charts, scheduling, dependencies, milestones, calendars, and built-in reporting. Project Professional adds the features that an organisation needs when it has more than one project running at a time, when it shares resources across teams, or when it wants a tighter collaboration path with SharePoint. The Resource Manager view and the resource pool workflow are the most visible additions, because they let a project manager coordinate shared people and equipment across multiple .mpp files. Team Planner is another Professional-only view, arranging work by team member so that conflicts and over-allocations are easy to see at a glance. SharePoint task list sync, the Office Add-in platform with read\/write access to project data, and the additional Office integration paths round out the collaboration story that the Standard edition does not provide.\u003c\/p\u003e\n\u003cp\u003eFor a single user running a single project, Standard is the right fit and the lower-cost option. For a PMO, a portfolio of related projects, or any team that shares resources across projects, Professional is the typical choice. The perpetual license model means the chosen edition stays available on each activated PC for the lifetime of the installation, with no monthly fees to manage and no auto-renewals to track.\u003c\/p\u003e\n\n\u003ch2\u003eCommon Workflows and Use Cases\u003c\/h2\u003e\n\u003cp\u003e\u003cstrong\u003eSoftware rollout planning.\u003c\/strong\u003e Project managers can use the built-in software rollout template, customise it for the specific release, and assign tasks to engineers, QA, and release managers. The Resource Manager view surfaces overallocation when two engineers are double-booked across the release and the next quarter's maintenance work, and the built-in leveling tool resolves the conflict by shifting the maintenance window. Status updates flow back from team members through the SharePoint task list, so the steering committee can see burndown and earned value analytics through the exported Excel and Power BI reports.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eConstruction and engineering coordination.\u003c\/strong\u003e For a multi-phase construction project, the resource pool holds the contractors, the equipment, and the shared on-site staff. The Team Planner view arranges the schedule by person, so the project manager can see who is on site, who is on the road, and who is overallocated for the week. Task Path highlighting surfaces the critical path, which is essential when a delay in the foundation phase cascades into every subsequent trade. Reporting is exported to PowerPoint for the weekly client update and to Excel for the cost reconciliation that the finance team runs at the end of the month.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eConsulting engagement management.\u003c\/strong\u003e A consulting firm can use a single .mpp file per engagement, with a shared resource pool that holds the partners, the senior consultants, and the staff. The SharePoint task list integration captures timesheets and status updates directly from team members, and the rate tables calculate the engagement margin as work is logged. Inactive tasks let the firm model what-if scenarios for the next quarter's pipeline without disturbing the live engagements.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eMarketing and event delivery.\u003c\/strong\u003e A marketing team running a campaign or an event delivery team running a conference can keep the master Gantt chart in Project and use the timeline view above the Gantt chart to present a clean executive roadmap to stakeholders. The Kanban-style board view (in Project 2021 and later) is the right tool for the daily standup, and the SharePoint task list sync keeps every contributor aligned without requiring them to open Project themselves.\u003c\/p\u003e\n\n\u003ch2\u003eSystem Requirements\u003c\/h2\u003e\n\u003ctable\u003e\n  \u003cthead\u003e\n    \u003ctr\u003e\n\u003cth\u003eComponent\u003c\/th\u003e\n\u003cth\u003eMinimum\u003c\/th\u003e\n\u003cth\u003eRecommended\u003c\/th\u003e\n\u003c\/tr\u003e\n  \u003c\/thead\u003e\n  \u003ctbody\u003e\n    \u003ctr\u003e\n\u003ctd\u003eOperating system\u003c\/td\u003e\n\u003ctd\u003eWindows 10 (32-bit or 64-bit), Windows 11, Windows Server 2019\u003c\/td\u003e\n\u003ctd\u003eWindows 11 (64-bit) with the latest cumulative updates\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eProcessor\u003c\/td\u003e\n\u003ctd\u003e1.6 GHz or faster, 2-core\u003c\/td\u003e\n\u003ctd\u003e2.0 GHz or faster, multi-core\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eMemory (RAM)\u003c\/td\u003e\n\u003ctd\u003e2 GB (32-bit) or 4 GB (64-bit)\u003c\/td\u003e\n\u003ctd\u003e8 GB for projects with resource pools and large .mpp files\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eHard disk space\u003c\/td\u003e\n\u003ctd\u003e4.0 GB available\u003c\/td\u003e\n\u003ctd\u003eSSD with 8 GB or more free for project files and backups\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eDisplay\u003c\/td\u003e\n\u003ctd\u003e1280 × 768 or higher resolution\u003c\/td\u003e\n\u003ctd\u003e1920 × 1080 or higher with DirectX 10 graphics\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eInternet\u003c\/td\u003e\n\u003ctd\u003eRequired for activation, optional for product use\u003c\/td\u003e\n\u003ctd\u003eBroadband for SharePoint sync and Power BI integration\u003c\/td\u003e\n\u003c\/tr\u003e\n  \u003c\/tbody\u003e\n\u003c\/table\u003e\n\n\u003ch2\u003eActivation and Licensing Notes\u003c\/h2\u003e\n\u003cp\u003eThe 2PC Retail Online key is a perpetual license for Microsoft Project 2021 Professional on two Windows PCs. The key is bound to the installation, not to a Microsoft account. Each PC can be reactivated after a reinstall using the same key. There is no upgrade entitlement: a separate license is required to move to \u003ca href=\"\/products\/microsoft-project-2024-professional-bind-1-pc\"\u003eProject 2024 Professional.\u003c\/a\u003e\u003c\/p\u003e\n\u003cp\u003eProject 2021 Professional is the supported release for Windows 10 and Windows 11. The 64-bit install is recommended for projects that exceed 5,000 tasks or that work with multiple resource pools, because the larger address space improves performance noticeably. For deployments that include SharePoint task list sync, the SharePoint 2019 or SharePoint Subscription Edition server environment must be available on the network.\u003c\/p\u003e\n\n\u003ch2\u003eGet Started With Microsoft Project 2021 Professional\u003c\/h2\u003e\n\u003cp\u003eDownload the Project 2021 Professional installer from the Microsoft volume licensing center or a trusted source, enter your 2PC product key on each workstation, and follow the activation wizard. The Microsoft Project 2021 Quick Start guide covers the most common project, resource, and reporting workflows. With a perpetual license, your team has Professional-grade project management capability on two Windows PCs for as long as each installation remains in service.\u003c\/p\u003e\u003ch2\u003eMicrosoft Project 2021 Professional Alternatives\u003c\/h2\u003e\n\u003cp\u003eThree credible alternatives cover most project management workloads.\u003c\/p\u003e\n\u003ch3\u003eMicrosoft Project Online (subscription)\u003c\/h3\u003e\u003cp\u003eCloud-based project management with Power BI reporting, resource engagement, and roadmap features. Best fit for organisations already on the Microsoft 365 platform.\u003c\/p\u003e\u003ch3\u003eAsana\u003c\/h3\u003e\u003cp\u003eModern work management platform with portfolios, goals, and timeline views. Strong fit for cross-functional teams that need both project and task tracking.\u003c\/p\u003e\u003ch3\u003eMonday.com or ClickUp\u003c\/h3\u003e\u003cp\u003eHighly configurable work management platforms with Gantt chart views, automations, and integrations. Best fit for teams that want a single tool for projects, tasks, and CRM-style work.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHow to choose:\u003c\/strong\u003e Stay on Project desktop if you need deep resource management, enterprise project types, and integration with the rest of the Microsoft platform. Choose Project Online for cloud access and Power BI reporting. Choose Asana or Monday if you need a flexible work management tool that goes beyond project scheduling.\u003c\/p\u003e\n\n\u003ch2\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eDoes Project 2021 Professional include the new Kanban board view?\u003c\/summary\u003e\n  \u003cp\u003eYes. Project 2021 Professional adds a Kanban-style board view that lets agile-leaning teams track tasks through customisable columns such as To Do, Doing, and Done. The view works alongside the traditional Gantt chart, so the same .mpp file supports both waterfall and agile workflows.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eCan the application be installed alongside Microsoft 365 Apps?\u003c\/summary\u003e\n  \u003cp\u003eYes. Project 2021 Professional can be installed side by side with the Office 365 apps from a Microsoft 365 plan without conflict, provided the .mpp file association is set explicitly. The two product families share the same .NET runtime and do not interfere with each other.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eDoes Project 2021 Professional work with Microsoft Teams?\u003c\/summary\u003e\n  \u003cp\u003eProject 2021 Professional does not include a native Teams app. The recommended collaboration pattern is to publish project tasks to a SharePoint task list, which is then added as a tab in a Teams channel. Team members see updates inside Teams, and the changes flow back into the master plan.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eWhat is the difference between the 2PC and 5PC variants?\u003c\/summary\u003e\n  \u003cp\u003eBoth variants grant the same Professional feature set and the same perpetual license terms. The 2PC variant covers two Windows PCs, while the 5PC variant covers five. The 2PC variant is the right choice for a project manager and a deputy; the 5PC variant is the right choice for a small PMO team.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eDoes this license include a free upgrade to Project 2024?\u003c\/summary\u003e\n  \u003cp\u003eNo. Project 2021 Professional is sold as a perpetual license for that version specifically. To upgrade, a new \u003ca href=\"\/products\/microsoft-project-2024-standard-bind-1-pc\"\u003eProject 2024 Standard\u003c\/a\u003e Professional license must be purchased. The .mpp file format remains compatible across releases, so existing plans open directly in Project 2024 once the new license is installed.\u003c\/p\u003e\n\u003c\/details\u003e\n\n","brand":"Microsoft","offers":[{"title":"Default Title","offer_id":59850908696657,"sku":"MS-050-MICROSOFT-PROJECT-2021-PROFESSIONAL-RETA","price":14.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1059\/0191\/6241\/files\/microsoft-project-2021-professional-retail-2-pc.webp?v=1784725525"},{"product_id":"microsoft-project-2021-professional-retail-5-pc","title":"Microsoft Project 2021 Professional Retail [5 PC]","description":"\u003ch2\u003eMicrosoft Project 2021 Professional for a Small PMO Team\u003c\/h2\u003e\n\u003cp\u003e\u003ca href=\"\/products\/microsoft-project-2021-professional-retail-5-pc\"\u003eMicrosoft Project 2021 Professional\u003c\/a\u003e is the desktop project and portfolio management application for PMO teams that need the resource pool, multi-project coordination, and SharePoint task list integration that the Standard edition does not provide, paired with the modernised Office 2021 user experience. The 2021 release introduces a refreshed interface, dark mode, multiple timelines for executive roadmaps, Kanban-style board views for agile work, and tighter integration with Power BI for stakeholder dashboards. The 5PC Retail Online license is the right fit for a project manager and four team members, or for a small PMO that needs Professional-grade capability on every workstation. Activation is a clean one-time step on each of the five Windows PCs, with no subscription portal to manage and no monthly usage fees — the same resource pool, multi-project coordination, and Power BI dashboards stay available on every workstation for the lifetime of the desktop application. Every key is sourced directly from Microsoft authorized channels and delivered to your account dashboard the moment your payment clears, so activation goes through cleanly without invalid-key errors and the same key reactivates after a clean reinstall or hardware change. Standard covers the core Gantt, scheduling, and reporting tools; Professional adds the resource pool, Team Planner, and SharePoint task list sync for multi-project coordination, so double-check the edition on the title before checkout. 📅 ⏱️ 📋\u003c\/p\u003e\n\n\u003ch2\u003eWhat Is Included and How Activation Works\u003c\/h2\u003e\n\u003cp\u003eYour 5PC Retail Online license includes one Microsoft \u003ca href=\"\/products\/microsoft-project-2019-professional-bind-1-pc\"\u003eProject 2019 Professional\u003c\/a\u003e 2021 Professional product key that activates the application on up to five Windows PCs. The license is perpetual, so there are no subscription fees to manage. The same key can be used to reactivate \u003ca href=\"\/products\/microsoft-project-2019-professional-retail-2-pc\"\u003eProject 2019 Professional\u003c\/a\u003e 2021 Professional on the same PCs after a clean reinstall of the operating system or after a hardware refresh.\u003c\/p\u003e\n\u003cp\u003eTo activate, run the Microsoft \u003ca href=\"\/products\/microsoft-project-2019-professional-retail-5-pc\"\u003eProject 2019 Professional\u003c\/a\u003e 2021 Professional installer on each Windows PC, enter the 25-character product key when prompted, and complete the online activation against the Microsoft activation service. An internet connection is required only for activation and for downloading updates; the application itself runs entirely offline once activated.\u003c\/p\u003e\n\n\u003ch2\u003eKey Features and Capabilities\u003c\/h2\u003e\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eModern Office 2021 ribbon and dark mode\u003c\/strong\u003e — the Fluent design language aligns \u003ca href=\"\/products\/microsoft-project-2016-professional-retail-5-pc\"\u003eProject 2016 Professional\u003c\/a\u003e 2021 with the rest of the Office 2021 family, and dark mode reduces eye strain for project managers who spend long hours in the application.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePre-built Gantt charts and templates\u003c\/strong\u003e — start a project in minutes with templates for software rollouts, construction, marketing campaigns, and event delivery; timelines are presented alongside the Gantt chart.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eResource Manager and resource pools\u003c\/strong\u003e — centralise people, equipment, and material resources across multiple .mpp files; identify over-allocations and run leveling to resolve them automatically.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTask Path highlighting\u003c\/strong\u003e — visualise the chain of predecessors and successors for any selected task; the critical path is rendered in red so at-risk work is visible at a glance.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTeam Planner view\u003c\/strong\u003e — a swim-lane view that arranges work by team member, surfaces scheduling conflicts side by side, and lets the project manager drag and drop tasks to rebalance the team.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eMultiple timelines\u003c\/strong\u003e — present executive-friendly roadmaps and stage gate summaries above the Gantt chart for steering committee and stakeholder reviews.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eKanban-style board views\u003c\/strong\u003e — visualise agile workflows, limit work in progress, and track tasks through customisable columns such as To Do, Doing, and Done.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eSharePoint task list sync and Power BI\u003c\/strong\u003e — publish tasks to SharePoint for browser-based updates and surface project metrics through Power BI dashboards.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eResource capacity heat maps\u003c\/strong\u003e — visualise overallocation, under-utilisation, and bench time across the team in a single colour-coded report.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePerformance and accessibility improvements\u003c\/strong\u003e — faster file open and save, smoother interaction on large plans, improved keyboard navigation, and better screen reader support.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eWho This Edition Is For\u003c\/h2\u003e\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePMO teams\u003c\/strong\u003e running a portfolio of related projects that share resources and need consolidated status reporting through SharePoint and Power BI on five workstations.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIT and engineering project leads\u003c\/strong\u003e standardising on the Office 2021 generation and needing Professional-grade resource and reporting tools on every team member's PC.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eConstruction and engineering coordinators\u003c\/strong\u003e managing contractors, internal staff, and equipment across multiple job sites with shared resource pools and capacity heat maps.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eAgile-leaning project teams\u003c\/strong\u003e that need Kanban-style board views alongside the traditional Gantt chart for hybrid planning across five workstations.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eStandard vs Professional: What Project Adds\u003c\/h2\u003e\n\u003cp\u003e\u003ca href=\"\/products\/microsoft-project-2013-professional-retail-5-pc\"\u003eProject 2013 Professional\u003c\/a\u003e Standard is the core project management application: Gantt charts, scheduling, dependencies, milestones, calendars, and built-in reporting. \u003ca href=\"\/products\/microsoft-project-2010-professional-retail-5-pc\"\u003eProject 2010 Professional\u003c\/a\u003e Professional adds the features that an organisation needs when it has more than one project running at a time, when it shares resources across teams, or when it wants a tighter collaboration path with SharePoint. The Resource Manager view and the resource pool workflow are the most visible additions, because they let a project manager coordinate shared people and equipment across multiple .mpp files. Team Planner is another Professional-only view, arranging work by team member so that conflicts and over-allocations are easy to see at a glance. SharePoint task list sync, the Office Add-in platform with read\/write access to project data, and the additional Office integration paths round out the collaboration story that the Standard edition does not provide.\u003c\/p\u003e\n\u003cp\u003eFor a single user running a single project, Standard is the right fit and the lower-cost option. For a PMO, a portfolio of related projects, or any team that shares resources across projects, Professional is the typical choice. The perpetual license model means the chosen edition stays available on each activated PC for the lifetime of the installation, with no monthly fees to manage and no auto-renewals to track.\u003c\/p\u003e\n\n\u003ch2\u003eCommon Workflows and Use Cases\u003c\/h2\u003e\n\u003cp\u003e\u003cstrong\u003eSoftware rollout planning.\u003c\/strong\u003e \u003ca href=\"\/products\/microsoft-project-2019-standard-retail-5-pc\"\u003eProject 2019 Standard\u003c\/a\u003e managers can use the built-in software rollout template, customise it for the specific release, and assign tasks to engineers, QA, and release managers. The Resource Manager view surfaces overallocation when two engineers are double-booked across the release and the next quarter's maintenance work, and the built-in leveling tool resolves the conflict by shifting the maintenance window. Status updates flow back from team members through the SharePoint task list, so the steering committee can see burndown and earned value analytics through the exported Excel and Power BI reports.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eConstruction and engineering coordination.\u003c\/strong\u003e For a multi-phase construction project, the resource pool holds the contractors, the equipment, and the shared on-site staff. The Team Planner view arranges the schedule by person, so the project manager can see who is on site, who is on the road, and who is overallocated for the week. Task Path highlighting surfaces the critical path, which is essential when a delay in the foundation phase cascades into every subsequent trade. Reporting is exported to PowerPoint for the weekly client update and to Excel for the cost reconciliation that the finance team runs at the end of the month.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eConsulting engagement management.\u003c\/strong\u003e A consulting firm can use a single .mpp file per engagement, with a shared resource pool that holds the partners, the senior consultants, and the staff. The SharePoint task list integration captures timesheets and status updates directly from team members, and the rate tables calculate the engagement margin as work is logged. Inactive tasks let the firm model what-if scenarios for the next quarter's pipeline without disturbing the live engagements.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eMarketing and event delivery.\u003c\/strong\u003e A marketing team running a campaign or an event delivery team running a conference can keep the master Gantt chart in Project and use the timeline view above the Gantt chart to present a clean executive roadmap to stakeholders. The Kanban-style board view (in Project 2021 and later) is the right tool for the daily standup, and the SharePoint task list sync keeps every contributor aligned without requiring them to open Project themselves.\u003c\/p\u003e\n\n\u003ch2\u003eSystem Requirements\u003c\/h2\u003e\n\u003ctable\u003e\n  \u003cthead\u003e\n    \u003ctr\u003e\n\u003cth\u003eComponent\u003c\/th\u003e\n\u003cth\u003eMinimum\u003c\/th\u003e\n\u003cth\u003eRecommended\u003c\/th\u003e\n\u003c\/tr\u003e\n  \u003c\/thead\u003e\n  \u003ctbody\u003e\n    \u003ctr\u003e\n\u003ctd\u003eOperating system\u003c\/td\u003e\n\u003ctd\u003eWindows 10 (32-bit or 64-bit), Windows 11, Windows Server 2019\u003c\/td\u003e\n\u003ctd\u003eWindows 11 (64-bit) with the latest cumulative updates\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eProcessor\u003c\/td\u003e\n\u003ctd\u003e1.6 GHz or faster, 2-core\u003c\/td\u003e\n\u003ctd\u003e2.0 GHz or faster, multi-core\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eMemory (RAM)\u003c\/td\u003e\n\u003ctd\u003e2 GB (32-bit) or 4 GB (64-bit)\u003c\/td\u003e\n\u003ctd\u003e8 GB for projects with resource pools and large .mpp files\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eHard disk space\u003c\/td\u003e\n\u003ctd\u003e4.0 GB available\u003c\/td\u003e\n\u003ctd\u003eSSD with 8 GB or more free for project files and backups\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eDisplay\u003c\/td\u003e\n\u003ctd\u003e1280 × 768 or higher resolution\u003c\/td\u003e\n\u003ctd\u003e1920 × 1080 or higher with DirectX 10 graphics\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eInternet\u003c\/td\u003e\n\u003ctd\u003eRequired for activation, optional for product use\u003c\/td\u003e\n\u003ctd\u003eBroadband for SharePoint sync and Power BI integration\u003c\/td\u003e\n\u003c\/tr\u003e\n  \u003c\/tbody\u003e\n\u003c\/table\u003e\n\n\u003ch2\u003eActivation and Licensing Notes\u003c\/h2\u003e\n\u003cp\u003eThe 5PC Retail Online key is a perpetual license for Microsoft Project 2021 Professional on five Windows PCs. The key is bound to the installation, not to a Microsoft account. Each PC can be reactivated after a reinstall using the same key. There is no upgrade entitlement: a separate license is required to move to \u003ca href=\"\/products\/microsoft-project-2024-professional-bind-1-pc\"\u003eProject 2024 Professional.\u003c\/a\u003e\u003c\/p\u003e\n\u003cp\u003eProject 2021 Professional is supported on Windows 10, Windows 11, and Windows Server 2019. The 64-bit install is recommended for projects that exceed 5,000 tasks or that work with multiple resource pools, because the larger address space improves performance noticeably. For deployments that include SharePoint task list sync, the SharePoint 2019 or SharePoint Subscription Edition server environment must be available on the network.\u003c\/p\u003e\n\n\u003ch2\u003eGet Started With Microsoft Project 2021 Professional\u003c\/h2\u003e\n\u003cp\u003eDownload the Project 2021 Professional installer from the Microsoft volume licensing center or a trusted source, enter your 5PC product key on each workstation, and follow the activation wizard. The Microsoft Project 2021 Quick Start guide covers the most common project, resource, and reporting workflows. With a perpetual license, your PMO team has Professional-grade project management capability on five Windows PCs for as long as each installation remains in service.\u003c\/p\u003e\u003ch2\u003eMicrosoft Project 2021 Professional Alternatives\u003c\/h2\u003e\n\u003cp\u003eThree credible alternatives cover most project management workloads.\u003c\/p\u003e\n\u003ch3\u003eMicrosoft Project Online (subscription)\u003c\/h3\u003e\u003cp\u003eCloud-based project management with Power BI reporting, resource engagement, and roadmap features. Best fit for organisations already on the Microsoft 365 platform.\u003c\/p\u003e\u003ch3\u003eAsana\u003c\/h3\u003e\u003cp\u003eModern work management platform with portfolios, goals, and timeline views. Strong fit for cross-functional teams that need both project and task tracking.\u003c\/p\u003e\u003ch3\u003eMonday.com or ClickUp\u003c\/h3\u003e\u003cp\u003eHighly configurable work management platforms with Gantt chart views, automations, and integrations. Best fit for teams that want a single tool for projects, tasks, and CRM-style work.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHow to choose:\u003c\/strong\u003e Stay on Project desktop if you need deep resource management, enterprise project types, and integration with the rest of the Microsoft platform. Choose Project Online for cloud access and Power BI reporting. Choose Asana or Monday if you need a flexible work management tool that goes beyond project scheduling.\u003c\/p\u003e\n\n\u003ch2\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eDoes Project 2021 Professional include Power BI integration?\u003c\/summary\u003e\n  \u003cp\u003eYes. Project 2021 Professional can publish project data to Power BI for stakeholder dashboards. A separate Power BI license is required to use Power BI itself; the Project license enables the data export path.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eCan Project 2021 Standard and Professional files be edited in the same team?\u003c\/summary\u003e\n  \u003cp\u003eYes. The .mpp file format is shared between Standard and Professional. Both editions can read the same plan, but only Professional can edit Professional-only features such as resource pool references. The team can mix Standard and Professional licenses as needed.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eWhat is the difference between the 2PC and 5PC variants?\u003c\/summary\u003e\n  \u003cp\u003eBoth variants grant the same Professional feature set and the same perpetual license terms. The 2PC variant covers two Windows PCs, while the 5PC variant covers five. The 2PC variant is the right choice for a project manager and a deputy; the 5PC variant is the right choice for a small PMO team.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eDoes this license include Microsoft Teams integration?\u003c\/summary\u003e\n  \u003cp\u003eProject 2021 Professional does not include a native Teams app. The recommended collaboration pattern is to publish project tasks to a SharePoint task list, which is then added as a tab in a Teams channel. Team members see updates inside Teams, and the changes flow back into the master plan.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eIs a Microsoft 365 subscription required?\u003c\/summary\u003e\n  \u003cp\u003eNo. Project 2021 Professional is a fully installed desktop application. The Retail Online key activates the product without requiring a Microsoft 365 subscription. An internet connection is required for the activation step and for optional updates, but the application itself runs offline.\u003c\/p\u003e\n\u003c\/details\u003e\n\n","brand":"Microsoft","offers":[{"title":"Default Title","offer_id":59850908762193,"sku":"MS-051-MICROSOFT-PROJECT-2021-PROFESSIONAL-RETA","price":24.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1059\/0191\/6241\/files\/microsoft-project-2021-professional-retail-5-pc.webp?v=1784725526"},{"product_id":"microsoft-project-2024-professional-bind-1-pc","title":"Microsoft Project 2024 Professional BIND [1 PC]","description":"\u003ch2\u003eMicrosoft Project 2024 Professional on a Single Windows PC\u003c\/h2\u003e\n\u003cp\u003e\u003ca href=\"\/products\/microsoft-project-2024-professional-bind-1-pc\"\u003eMicrosoft Project 2024 Professional\u003c\/a\u003e is the current-generation desktop project and portfolio management application for individual project managers who need the deeper resource and reporting tools that the Standard edition does not provide. The 2024 release introduces a refreshed Fluent design, modern dark mode, performance and accessibility upgrades, and full compatibility with the new \u003ca href=\"\/products\/microsoft-project-2019-professional-bind-1-pc\"\u003eProject 2019 Professional\u003c\/a\u003e and Roadmap apps for Microsoft Teams. The 1PC BIND license is delivered as a Microsoft account–bound key, which keeps the license attached to the user rather than to the hardware. When the project manager signs in on a new PC, the \u003ca href=\"\/products\/microsoft-project-2019-professional-retail-2-pc\"\u003eProject 2019 Professional\u003c\/a\u003e 2024 Professional license reattaches to the Microsoft account and the same Fluent interface, dark mode, and Microsoft Teams Roadmap integration come back online without re-purchasing, with no subscription portal to manage and no monthly usage fees. Every key is sourced directly from Microsoft authorized channels and delivered to your account dashboard the moment your payment clears, so activation goes through cleanly without invalid-key errors and the same key reactivates after a clean reinstall or hardware change. Standard covers the core Gantt, scheduling, and reporting tools; Professional adds the resource pool, Team Planner, and SharePoint task list sync for multi-project coordination, so double-check the edition on the title before checkout. 📋 ⏱️ 📅\u003c\/p\u003e\n\n\u003ch2\u003eWhat Is Included and How Activation Works\u003c\/h2\u003e\n\u003cp\u003eYour 1PC BIND license includes one Microsoft \u003ca href=\"\/products\/microsoft-project-2019-professional-retail-5-pc\"\u003eProject 2019 Professional\u003c\/a\u003e 2024 Professional product key that activates the application on a single Windows PC, bound to your Microsoft account. The license is perpetual, so there are no subscription fees to manage. To activate, sign in to setup.office.com with your Microsoft account, enter the 25-character product key, and download the \u003ca href=\"\/products\/microsoft-project-2016-professional-retail-5-pc\"\u003eProject 2016 Professional\u003c\/a\u003e 2024 Professional installer.\u003c\/p\u003e\n\u003cp\u003eOnce the installer is downloaded, run it on the Windows PC you want to use as your primary workstation, sign in to the same Microsoft account when prompted, and the application activates automatically. The license is associated with the account, so if you replace the workstation, you can sign in on the new device and reinstall \u003ca href=\"\/products\/microsoft-project-2013-professional-retail-5-pc\"\u003eProject 2013 Professional\u003c\/a\u003e 2024 Professional from your account without contacting support for a new key.\u003c\/p\u003e\n\n\u003ch2\u003eKey Features and Capabilities\u003c\/h2\u003e\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eModern Office 2024 ribbon and dark mode\u003c\/strong\u003e — the refreshed Fluent design aligns \u003ca href=\"\/products\/microsoft-project-2010-professional-retail-5-pc\"\u003eProject 2010 Professional\u003c\/a\u003e 2024 with the rest of the Office 2024 family, and the modern dark mode reduces eye strain for project managers who spend long hours in the application.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePre-built Gantt charts and templates\u003c\/strong\u003e — start a project in minutes with templates for software rollouts, construction, marketing campaigns, and event delivery; timelines are presented alongside the Gantt chart.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eResource Manager and resource pools\u003c\/strong\u003e — centralise people, equipment, and material resources across multiple .mpp files; identify over-allocations and run leveling to resolve them automatically.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTask Path highlighting\u003c\/strong\u003e — visualise the chain of predecessors and successors for any selected task; the critical path is rendered in red so at-risk work is visible at a glance.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTeam Planner view\u003c\/strong\u003e — a swim-lane view that arranges work by team member, surfaces scheduling conflicts side by side, and lets the project manager drag and drop tasks to rebalance the team.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eMultiple timelines\u003c\/strong\u003e — present executive-friendly roadmaps and stage gate summaries above the Gantt chart for steering committee and stakeholder reviews.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eKanban-style board views\u003c\/strong\u003e — visualise agile workflows, limit work in progress, and track tasks through customisable columns such as To Do, Doing, and Done.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eSharePoint task list sync, Power BI, and Teams\u003c\/strong\u003e — publish tasks to SharePoint for browser-based updates, surface project metrics through Power BI dashboards, and pin project views inside Microsoft Teams as channel tabs.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eResource capacity heat maps\u003c\/strong\u003e — visualise overallocation, under-utilisation, and bench time across the team in a single colour-coded report.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePerformance and accessibility improvements\u003c\/strong\u003e — faster file open and save, smoother interaction on large plans, improved keyboard navigation, and better screen reader support.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eWho This Edition Is For\u003c\/h2\u003e\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIndividual project managers\u003c\/strong\u003e who need the current-generation Professional-grade resource and reporting tools on a single Windows PC, with a modern Microsoft account binding flow.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIT project leads and PMO analysts\u003c\/strong\u003e who want a perpetual \u003ca href=\"\/products\/microsoft-project-2019-standard-retail-5-pc\"\u003eProject 2019 Standard\u003c\/a\u003e 2024 Professional license without committing to a Microsoft 365 subscription.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eConsultants and contractors\u003c\/strong\u003e who need a single, portable Project license that can be moved to a new workstation by signing in to their Microsoft account.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eOrganisations standardising on Office 2024\u003c\/strong\u003e that want the refreshed Fluent design language and the new Teams integration that the 2024 generation delivers.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eStandard vs Professional: What Project Adds\u003c\/h2\u003e\n\u003cp\u003eProject Standard is the core project management application: Gantt charts, scheduling, dependencies, milestones, calendars, and built-in reporting. Project Professional adds the features that an organisation needs when it has more than one project running at a time, when it shares resources across teams, or when it wants a tighter collaboration path with SharePoint. The Resource Manager view and the resource pool workflow are the most visible additions, because they let a project manager coordinate shared people and equipment across multiple .mpp files. Team Planner is another Professional-only view, arranging work by team member so that conflicts and over-allocations are easy to see at a glance. SharePoint task list sync, the Office Add-in platform with read\/write access to project data, and the additional Office integration paths round out the collaboration story that the Standard edition does not provide.\u003c\/p\u003e\n\u003cp\u003eFor a single user running a single project, Standard is the right fit and the lower-cost option. For a PMO, a portfolio of related projects, or any team that shares resources across projects, Professional is the typical choice. The perpetual license model means the chosen edition stays available on each activated PC for the lifetime of the installation, with no monthly fees to manage and no auto-renewals to track.\u003c\/p\u003e\n\n\u003ch2\u003eCommon Workflows and Use Cases\u003c\/h2\u003e\n\u003cp\u003e\u003cstrong\u003eSoftware rollout planning.\u003c\/strong\u003e Project managers can use the built-in software rollout template, customise it for the specific release, and assign tasks to engineers, QA, and release managers. The Resource Manager view surfaces overallocation when two engineers are double-booked across the release and the next quarter's maintenance work, and the built-in leveling tool resolves the conflict by shifting the maintenance window. Status updates flow back from team members through the SharePoint task list, so the steering committee can see burndown and earned value analytics through the exported Excel and Power BI reports.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eConstruction and engineering coordination.\u003c\/strong\u003e For a multi-phase construction project, the resource pool holds the contractors, the equipment, and the shared on-site staff. The Team Planner view arranges the schedule by person, so the project manager can see who is on site, who is on the road, and who is overallocated for the week. Task Path highlighting surfaces the critical path, which is essential when a delay in the foundation phase cascades into every subsequent trade. Reporting is exported to PowerPoint for the weekly client update and to Excel for the cost reconciliation that the finance team runs at the end of the month.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eConsulting engagement management.\u003c\/strong\u003e A consulting firm can use a single .mpp file per engagement, with a shared resource pool that holds the partners, the senior consultants, and the staff. The SharePoint task list integration captures timesheets and status updates directly from team members, and the rate tables calculate the engagement margin as work is logged. Inactive tasks let the firm model what-if scenarios for the next quarter's pipeline without disturbing the live engagements.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eMarketing and event delivery.\u003c\/strong\u003e A marketing team running a campaign or an event delivery team running a conference can keep the master Gantt chart in Project and use the timeline view above the Gantt chart to present a clean executive roadmap to stakeholders. The Kanban-style board view (in \u003ca href=\"\/products\/microsoft-project-2021-professional-retail-2-pc\"\u003eProject 2021 Professional\u003c\/a\u003e and later) is the right tool for the daily standup, and the SharePoint task list sync keeps every contributor aligned without requiring them to open Project themselves.\u003c\/p\u003e\n\n\u003ch2\u003eSystem Requirements\u003c\/h2\u003e\n\u003ctable\u003e\n  \u003cthead\u003e\n    \u003ctr\u003e\n\u003cth\u003eComponent\u003c\/th\u003e\n\u003cth\u003eMinimum\u003c\/th\u003e\n\u003cth\u003eRecommended\u003c\/th\u003e\n\u003c\/tr\u003e\n  \u003c\/thead\u003e\n  \u003ctbody\u003e\n    \u003ctr\u003e\n\u003ctd\u003eOperating system\u003c\/td\u003e\n\u003ctd\u003eWindows 10 (64-bit), Windows 11, Windows Server 2019, Windows Server 2022\u003c\/td\u003e\n\u003ctd\u003eWindows 11 (64-bit) with the latest cumulative updates\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eProcessor\u003c\/td\u003e\n\u003ctd\u003e1.6 GHz or faster, 2-core\u003c\/td\u003e\n\u003ctd\u003e2.0 GHz or faster, multi-core\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eMemory (RAM)\u003c\/td\u003e\n\u003ctd\u003e4 GB (64-bit)\u003c\/td\u003e\n\u003ctd\u003e8 GB or more for projects with resource pools and large .mpp files\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eHard disk space\u003c\/td\u003e\n\u003ctd\u003e4.0 GB available\u003c\/td\u003e\n\u003ctd\u003eSSD with 10 GB or more free for project files and backups\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eDisplay\u003c\/td\u003e\n\u003ctd\u003e1280 × 768 or higher resolution\u003c\/td\u003e\n\u003ctd\u003e1920 × 1080 or higher with DirectX 10 graphics\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eInternet\u003c\/td\u003e\n\u003ctd\u003eRequired for account binding and updates\u003c\/td\u003e\n\u003ctd\u003eBroadband for SharePoint sync, Power BI integration, and Teams\u003c\/td\u003e\n\u003c\/tr\u003e\n  \u003c\/tbody\u003e\n\u003c\/table\u003e\n\n\u003ch2\u003eActivation and Licensing Notes\u003c\/h2\u003e\n\u003cp\u003eThe 1PC BIND license is a perpetual license for Microsoft Project 2024 Professional on a single Windows PC, bound to your Microsoft account. Once the key is redeemed at setup.office.com, the license is attached to the account and the installer downloads the application to the active device. The license follows the account: if you replace the workstation, sign in to the new device with the same Microsoft account and reinstall Project 2024 Professional from the account page.\u003c\/p\u003e\n\u003cp\u003eProject 2024 Professional is the current generation and is supported on Windows 10 64-bit, Windows 11, and Windows Server 2019 or 2022. For organisations that have moved to Microsoft 365 Apps, Project 2024 Professional can be installed side by side with the Office 365 apps without conflict, provided the .mpp file association is set explicitly.\u003c\/p\u003e\n\n\u003ch2\u003eGet Started With Microsoft Project 2024 Professional\u003c\/h2\u003e\n\u003cp\u003eVisit setup.office.com, sign in with your Microsoft account, and enter the 25-character product key. Download the Project 2024 Professional installer, run it on your Windows PC, and sign in to the same Microsoft account when prompted. The Microsoft Project 2024 Quick Start guide covers the most common project, resource, and reporting workflows. With a perpetual, account-bound license, your Professional-grade project management tool follows your Microsoft account and is ready to use on your primary workstation for as long as you keep the installation.\u003c\/p\u003e\u003ch2\u003eMicrosoft Project 2024 Professional Alternatives\u003c\/h2\u003e\n\u003cp\u003eThree credible alternatives cover most project management workloads.\u003c\/p\u003e\n\u003ch3\u003eMicrosoft Project Online (subscription)\u003c\/h3\u003e\u003cp\u003eCloud-based project management with Power BI reporting, resource engagement, and roadmap features. Best fit for organisations already on the Microsoft 365 platform.\u003c\/p\u003e\u003ch3\u003eAsana\u003c\/h3\u003e\u003cp\u003eModern work management platform with portfolios, goals, and timeline views. Strong fit for cross-functional teams that need both project and task tracking.\u003c\/p\u003e\u003ch3\u003eMonday.com or ClickUp\u003c\/h3\u003e\u003cp\u003eHighly configurable work management platforms with Gantt chart views, automations, and integrations. Best fit for teams that want a single tool for projects, tasks, and CRM-style work.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHow to choose:\u003c\/strong\u003e Stay on Project desktop if you need deep resource management, enterprise project types, and integration with the rest of the Microsoft platform. Choose Project Online for cloud access and Power BI reporting. Choose Asana or Monday if you need a flexible work management tool that goes beyond project scheduling.\u003c\/p\u003e\n\n\u003ch2\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eWhat does BIND mean for this license?\u003c\/summary\u003e\n  \u003cp\u003eBIND means the product key is redeemed at setup.office.com and the resulting license is attached to your Microsoft account rather than to the PC. This makes it straightforward to move the installation to a new device, because the license is downloaded from your account rather than activated against hardware.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eCan I install Project 2024 Professional on a second PC?\u003c\/summary\u003e\n  \u003cp\u003eThe 1PC BIND license is for a single Windows PC. If you need to install Project on a second PC, you should purchase a second 1PC BIND license. The 5PC Retail Online variant of Project 2024 Professional is the right option if you need to cover multiple devices, when available.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eDoes Project 2024 Professional integrate with Microsoft Teams?\u003c\/summary\u003e\n  \u003cp\u003eYes. Project 2024 Professional can publish project tasks to a SharePoint task list, which is then added as a tab in a Microsoft Teams channel. For native Project and Roadmap apps in Teams, the recommended pairing is Project for the web and Project Online, which are subscription services.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eIs a Microsoft 365 subscription required?\u003c\/summary\u003e\n  \u003cp\u003eNo. Project 2024 Professional is a fully installed desktop application. The BIND activation flow uses a Microsoft account, but no Microsoft 365 subscription is required. The application continues to work after the initial activation, even if the Microsoft account is not part of a Microsoft 365 plan.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eWhat happens to my .mpp files if I switch to a new device?\u003c\/summary\u003e\n  \u003cp\u003eThe .mpp files live on the device disk and must be moved manually. OneDrive for Business, SharePoint, or any file sync tool is the recommended way to keep project files available across multiple devices, including the new workstation.\u003c\/p\u003e\n\u003c\/details\u003e\n\n","brand":"Microsoft","offers":[{"title":"Default Title","offer_id":59850908860497,"sku":"MS-052-MICROSOFT-PROJECT-2024-PROFESSIONAL-BIND","price":89.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1059\/0191\/6241\/files\/microsoft-project-2024-professional-bind-1-pc.webp?v=1784725527"},{"product_id":"microsoft-project-2024-standard-bind-1-pc","title":"Microsoft Project 2024 Standard BIND [1 PC]","description":"\u003ch2\u003eMicrosoft Project 2024 Standard on a Single Windows PC\u003c\/h2\u003e\n\u003cp\u003e\u003ca href=\"\/products\/microsoft-project-2024-standard-bind-1-pc\"\u003eMicrosoft Project 2024 Standard\u003c\/a\u003e is the current-generation desktop project management application for individual project managers who need the core Gantt chart, scheduling, and reporting capabilities without the resource pool, Team Planner, and SharePoint task list integration that the Professional edition adds. The 2024 release introduces a refreshed Fluent design, modern dark mode, performance and accessibility upgrades, and a refreshed shape library. The 1PC BIND license is delivered as a Microsoft account–bound key, which keeps the license attached to the user rather than to the hardware. When the project manager signs in on a new PC, the \u003ca href=\"\/products\/microsoft-project-2019-professional-bind-1-pc\"\u003eProject 2019 Professional\u003c\/a\u003e 2024 Standard license reattaches to the Microsoft account and the same Fluent interface, dark mode, and refreshed shape library come back online without re-purchasing, with no subscription portal to manage and no monthly usage fees. Every key is sourced directly from Microsoft authorized channels and delivered to your account dashboard the moment your payment clears, so activation goes through cleanly without invalid-key errors and the same key reactivates after a clean reinstall or hardware change. Standard covers the core Gantt, scheduling, and reporting tools; Professional adds the resource pool, Team Planner, and SharePoint task list sync for multi-project coordination, so double-check the edition on the title before checkout. 📋 📅 ⏱️\u003c\/p\u003e\n\n\u003ch2\u003eWhat Is Included and How Activation Works\u003c\/h2\u003e\n\u003cp\u003eYour 1PC BIND license includes one Microsoft \u003ca href=\"\/products\/microsoft-project-2019-professional-retail-2-pc\"\u003eProject 2019 Professional\u003c\/a\u003e 2024 Standard product key that activates the application on a single Windows PC, bound to your Microsoft account. The license is perpetual, so there are no subscription fees to manage. To activate, sign in to setup.office.com with your Microsoft account, enter the 25-character product key, and download the \u003ca href=\"\/products\/microsoft-project-2019-professional-retail-5-pc\"\u003eProject 2019 Professional\u003c\/a\u003e 2024 Standard installer.\u003c\/p\u003e\n\u003cp\u003eOnce the installer is downloaded, run it on the Windows PC you want to use as your primary workstation, sign in to the same Microsoft account when prompted, and the application activates automatically. The license is associated with the account, so if you replace the workstation, you can sign in on the new device and reinstall \u003ca href=\"\/products\/microsoft-project-2016-professional-retail-5-pc\"\u003eProject 2016 Professional\u003c\/a\u003e 2024 Standard from your account without contacting support for a new key.\u003c\/p\u003e\n\n\u003ch2\u003eKey Features and Capabilities\u003c\/h2\u003e\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eModern Office 2024 ribbon and dark mode\u003c\/strong\u003e — the refreshed Fluent design aligns \u003ca href=\"\/products\/microsoft-project-2013-professional-retail-5-pc\"\u003eProject 2013 Professional\u003c\/a\u003e 2024 with the rest of the Office 2024 family, and the modern dark mode reduces eye strain for project managers who spend long hours in the application.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePre-built Gantt charts and templates\u003c\/strong\u003e — start a project in minutes with templates for software rollouts, construction, marketing campaigns, and event delivery; timelines are presented alongside the Gantt chart.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTask dependencies and critical path\u003c\/strong\u003e — define finish-to-start, start-to-start, finish-to-finish, and start-to-finish dependencies with lead and lag; the critical path is rendered in red so at-risk work is visible at a glance.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eMilestones and deadlines\u003c\/strong\u003e — mark key delivery points and contractual dates; the application surfaces them on the timeline view for stakeholder reporting.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eBuilt-in reports\u003c\/strong\u003e — generate pre-built reports on project overview, cost overview, work overview, upcoming tasks, and task costing without manual report design.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eCustomisable calendars\u003c\/strong\u003e — model shifts, holidays, and time-off windows; apply calendars at the project, task, or resource level to reflect real working time.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eMultiple timelines\u003c\/strong\u003e — present executive-friendly roadmaps and stage gate summaries above the Gantt chart for steering committee and stakeholder reviews.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eKanban-style board views\u003c\/strong\u003e — visualise agile workflows, limit work in progress, and track tasks through customisable columns such as To Do, Doing, and Done.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eOffice Add-in platform support\u003c\/strong\u003e — read\/write access for Office Add-ins lets custom or third-party tools interact with project data, schedules, and resources.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePerformance and accessibility improvements\u003c\/strong\u003e — faster file open and save, smoother interaction on large plans, improved keyboard navigation, and better screen reader support.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eWho This Edition Is For\u003c\/h2\u003e\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIndividual project managers and coordinators\u003c\/strong\u003e who need the core Gantt chart, scheduling, and reporting capabilities on a single Windows PC with the modern Office 2024 look and feel.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIT and engineering team leads\u003c\/strong\u003e running single, well-scoped projects with a defined scope and a stable team.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eMarketing and event project managers\u003c\/strong\u003e who need a perpetual desktop project management tool for campaigns that do not share resources across portfolios.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eConsultants and individual contributors\u003c\/strong\u003e who need a single, portable \u003ca href=\"\/products\/microsoft-project-2010-professional-retail-5-pc\"\u003eProject 2010 Professional\u003c\/a\u003e license that can be moved to a new workstation by signing in to their Microsoft account.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eStandard vs Professional: When Standard Is the Right Fit\u003c\/h2\u003e\n\u003cp\u003eProject Standard includes the core project management application: Gantt charts, scheduling, dependencies, milestones, calendars, built-in reports, and the modernised Office user experience. Project Professional adds the features that an organisation needs when it has more than one project running at a time, when it shares resources across teams, or when it wants a tighter collaboration path with SharePoint. The Resource Manager view and the resource pool workflow, the Team Planner view, the SharePoint task list sync, and the Office Add-in read\/write access to project data are the most visible additions that the Standard edition does not provide.\u003c\/p\u003e\n\u003cp\u003eFor a single user running a single project, or for a small team running well-scoped projects with a stable resource pool, Standard is the right fit and the lower-cost option. For a PMO, a portfolio of related projects, or any team that shares resources across projects, Professional is the typical choice. The perpetual license model means the chosen edition stays available on each activated PC for the lifetime of the installation, with no monthly fees to manage and no auto-renewals to track.\u003c\/p\u003e\n\n\u003ch2\u003eCommon Workflows and Use Cases\u003c\/h2\u003e\n\u003cp\u003e\u003cstrong\u003eSoftware rollout planning.\u003c\/strong\u003e Project managers can use the built-in software rollout template, customise it for the specific release, and assign tasks to engineers, QA, and release managers. Task Path highlighting surfaces the critical path, and the built-in reports on project overview, cost overview, and work overview keep the steering committee informed.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eMarketing campaign tracking.\u003c\/strong\u003e A marketing team can keep the master Gantt chart in Project, use the timeline view above the Gantt chart to present a clean executive roadmap, and export the schedule to PowerPoint for the campaign kickoff. Milestones mark the key campaign dates, and the built-in reports keep the team aligned.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eEvent delivery.\u003c\/strong\u003e An event delivery team running a conference can use the built-in event template, customise it for the specific event, and use the multiple timelines (in \u003ca href=\"\/products\/microsoft-project-2021-professional-retail-2-pc\"\u003eProject 2021 Professional\u003c\/a\u003e and later) to show executive and operational views of the same plan. The Kanban-style board view (in \u003ca href=\"\/products\/microsoft-project-2021-professional-retail-5-pc\"\u003eProject 2021 Professional\u003c\/a\u003e and later) is the right tool for the daily standup, and the Gantt chart is the right tool for the weekly steering committee review.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eConstruction and small engineering work.\u003c\/strong\u003e A small construction or engineering team can use the built-in construction template, customise it for the specific project, and use the critical path analysis to identify the tasks that drive the schedule. The customisable calendars handle shifts, holidays, and time-off, and the rate tables calculate the cost as work is logged.\u003c\/p\u003e\n\n\u003ch2\u003eSystem Requirements\u003c\/h2\u003e\n\u003ctable\u003e\n  \u003cthead\u003e\n    \u003ctr\u003e\n\u003cth\u003eComponent\u003c\/th\u003e\n\u003cth\u003eMinimum\u003c\/th\u003e\n\u003cth\u003eRecommended\u003c\/th\u003e\n\u003c\/tr\u003e\n  \u003c\/thead\u003e\n  \u003ctbody\u003e\n    \u003ctr\u003e\n\u003ctd\u003eOperating system\u003c\/td\u003e\n\u003ctd\u003eWindows 10 (64-bit), Windows 11, Windows Server 2019, Windows Server 2022\u003c\/td\u003e\n\u003ctd\u003eWindows 11 (64-bit) with the latest cumulative updates\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eProcessor\u003c\/td\u003e\n\u003ctd\u003e1.6 GHz or faster, 2-core\u003c\/td\u003e\n\u003ctd\u003e2.0 GHz or faster, multi-core\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eMemory (RAM)\u003c\/td\u003e\n\u003ctd\u003e4 GB (64-bit)\u003c\/td\u003e\n\u003ctd\u003e8 GB or more for projects with large .mpp files or many subprojects\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eHard disk space\u003c\/td\u003e\n\u003ctd\u003e4.0 GB available\u003c\/td\u003e\n\u003ctd\u003eSSD with 10 GB or more free for project files and backups\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eDisplay\u003c\/td\u003e\n\u003ctd\u003e1280 × 768 or higher resolution\u003c\/td\u003e\n\u003ctd\u003e1920 × 1080 or higher with DirectX 10 graphics\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eInternet\u003c\/td\u003e\n\u003ctd\u003eRequired for account binding and updates\u003c\/td\u003e\n\u003ctd\u003eBroadband for Office Add-in marketplace and updates\u003c\/td\u003e\n\u003c\/tr\u003e\n  \u003c\/tbody\u003e\n\u003c\/table\u003e\n\n\u003ch2\u003eActivation and Licensing Notes\u003c\/h2\u003e\n\u003cp\u003eThe 1PC BIND license is a perpetual license for Microsoft Project 2024 Standard on a single Windows PC, bound to your Microsoft account. Once the key is redeemed at setup.office.com, the license is attached to the account and the installer downloads the application to the active device. The license follows the account: if you replace the workstation, sign in to the new device with the same Microsoft account and reinstall Project 2024 Standard from the account page.\u003c\/p\u003e\n\u003cp\u003eProject 2024 Standard is the current generation and is supported on Windows 10 64-bit, Windows 11, and Windows Server 2019 or 2022. Plans created in Project 2024 Standard open in \u003ca href=\"\/products\/microsoft-project-2024-professional-bind-1-pc\"\u003eProject 2024 Professional\u003c\/a\u003e and in the Project Online Desktop Client. If a project grows to need a shared resource pool or SharePoint task list sync, the team can move to Project 2024 Professional and the existing .mpp files will load with all task data intact.\u003c\/p\u003e\n\n\u003ch2\u003eGet Started With Microsoft Project 2024 Standard\u003c\/h2\u003e\n\u003cp\u003eVisit setup.office.com, sign in with your Microsoft account, and enter the 25-character product key. Download the Project 2024 Standard installer, run it on your Windows PC, and sign in to the same Microsoft account when prompted. The Microsoft Project 2024 Quick Start guide covers the most common project, scheduling, and reporting workflows. With a perpetual, account-bound license, your core project management tool follows your Microsoft account and is ready to use on your primary workstation for as long as you keep the installation.\u003c\/p\u003e\u003ch2\u003eMicrosoft Project 2024 Standard Alternatives\u003c\/h2\u003e\n\u003cp\u003eThree credible alternatives cover most project management workloads.\u003c\/p\u003e\n\u003ch3\u003eMicrosoft Project Online (subscription)\u003c\/h3\u003e\u003cp\u003eCloud-based project management with Power BI reporting, resource engagement, and roadmap features. Best fit for organisations already on the Microsoft 365 platform.\u003c\/p\u003e\u003ch3\u003eAsana\u003c\/h3\u003e\u003cp\u003eModern work management platform with portfolios, goals, and timeline views. Strong fit for cross-functional teams that need both project and task tracking.\u003c\/p\u003e\u003ch3\u003eMonday.com or ClickUp\u003c\/h3\u003e\u003cp\u003eHighly configurable work management platforms with Gantt chart views, automations, and integrations. Best fit for teams that want a single tool for projects, tasks, and CRM-style work.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHow to choose:\u003c\/strong\u003e Stay on Project desktop if you need deep resource management, enterprise project types, and integration with the rest of the Microsoft platform. Choose Project Online for cloud access and Power BI reporting. Choose Asana or Monday if you need a flexible work management tool that goes beyond project scheduling.\u003c\/p\u003e\n\n\u003ch2\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eWhat does BIND mean for this license?\u003c\/summary\u003e\n  \u003cp\u003eBIND means the product key is redeemed at setup.office.com and the resulting license is attached to your Microsoft account rather than to the PC. This makes it straightforward to move the installation to a new device, because the license is downloaded from your account rather than activated against hardware.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eCan I install Project 2024 Standard on a second PC?\u003c\/summary\u003e\n  \u003cp\u003eThe 1PC BIND license is for a single Windows PC. If you need to install Project on a second PC, you should purchase a second 1PC BIND license. Project 2024 Professional is the right step if the second device also needs resource pools, Team Planner, or SharePoint task list sync.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eWhat is the difference between Project 2024 Standard and Professional?\u003c\/summary\u003e\n  \u003cp\u003eProject 2024 Standard is the core project management application: Gantt charts, scheduling, dependencies, milestones, calendars, multiple timelines, Kanban board views, and built-in reports. Project 2024 Professional adds resource pools, Team Planner, SharePoint task list sync, Power BI integration, and the additional Office Add-in capabilities that the Professional edition unlocks. For a single user running single projects, Standard is the right choice; for a PMO running a portfolio, Professional is the typical fit.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eIs a Microsoft 365 subscription required?\u003c\/summary\u003e\n  \u003cp\u003eNo. Project 2024 Standard is a fully installed desktop application. The BIND activation flow uses a Microsoft account, but no Microsoft 365 subscription is required. The application continues to work after the initial activation, even if the Microsoft account is not part of a Microsoft 365 plan.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eCan the team move from Standard to Professional later?\u003c\/summary\u003e\n  \u003cp\u003eYes. A new Project 2024 Professional license can be installed on the same Windows PC, and the existing .mpp files will open in the Professional edition without conversion. The Standard and Professional editions cannot both be installed on the same PC at the same time, so the Standard license should be removed first.\u003c\/p\u003e\n\u003c\/details\u003e\n\n","brand":"Microsoft","offers":[{"title":"Default Title","offer_id":59850908991569,"sku":"MS-053-MICROSOFT-PROJECT-2024-STANDARD-BIND-1-P","price":89.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1059\/0191\/6241\/files\/microsoft-project-2024-standard-bind-1-pc.webp?v=1784725529"}],"url":"https:\/\/dotkeys.net\/collections\/project.oembed","provider":"DotKeys","version":"1.0","type":"link"}