{"product_id":"microsoft-project-2019-professional-retail-2-pc","title":"Microsoft Project 2019 Professional Retail [2 PC]","description":"\u003ch2\u003eMicrosoft Project 2019 Professional on Two Windows PCs\u003c\/h2\u003e\n\u003cp\u003e\u003ca href=\"\/products\/microsoft-project-2019-professional-retail-2-pc\"\u003eMicrosoft Project 2019 Professional\u003c\/a\u003e is the desktop project and portfolio management application for project managers who need the deeper resource and reporting tools that the Standard edition does not provide. The 2019 release introduces a modernised ribbon, dark mode, improved accessibility, and timeline bar labels that show progress directly on the Gantt chart. The 2PC Retail Online license is designed for a project manager and a deputy, or for a project lead who alternates between a desktop and a laptop workstation. Activation is a clean one-time step on each of the two Windows PCs, with no subscription portal to manage and no monthly usage fees — the same resource pool, multi-project coordination, and SharePoint task list sync stay available on both installs for the lifetime of the desktop application. Every key is sourced directly from Microsoft authorized channels and delivered to your account dashboard the moment your payment clears, so activation goes through cleanly without invalid-key errors and the same key reactivates after a clean reinstall or hardware change. Standard covers the core Gantt, scheduling, and reporting tools; Professional adds the resource pool, Team Planner, and SharePoint task list sync for multi-project coordination, so double-check the edition on the title before checkout. 📋 ⏱️ 📅\u003c\/p\u003e\n\n\u003ch2\u003eWhat Is Included and How Activation Works\u003c\/h2\u003e\n\u003cp\u003eYour 2PC Retail Online license includes one Microsoft \u003ca href=\"\/products\/microsoft-project-2019-professional-retail-5-pc\"\u003eProject 2019 Professional\u003c\/a\u003e product key that activates the application on up to two Windows PCs. The license is perpetual, so there are no subscription fees to manage. The same key can be used to reactivate \u003ca href=\"\/products\/microsoft-project-2016-professional-retail-5-pc\"\u003eProject 2016 Professional\u003c\/a\u003e 2019 Professional on the same PCs after a clean reinstall of the operating system or after a hardware refresh.\u003c\/p\u003e\n\u003cp\u003eTo activate, run the Microsoft \u003ca href=\"\/products\/microsoft-project-2013-professional-retail-5-pc\"\u003eProject 2013 Professional\u003c\/a\u003e 2019 Professional installer on each Windows PC, enter the 25-character product key when prompted, and complete the online activation against the Microsoft activation service. An internet connection is required only for activation and for downloading updates; the application itself runs entirely offline once activated.\u003c\/p\u003e\n\n\u003ch2\u003eKey Features and Capabilities\u003c\/h2\u003e\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eModern Office 2019 ribbon and dark mode\u003c\/strong\u003e — the Fluent design language aligns \u003ca href=\"\/products\/microsoft-project-2010-professional-retail-5-pc\"\u003eProject 2010 Professional\u003c\/a\u003e 2019 with the rest of the Office 2019 family, and dark mode reduces eye strain for project managers who spend long hours in the application.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePre-built Gantt charts and templates\u003c\/strong\u003e — start a project in minutes with templates for software rollouts, construction, marketing campaigns, and event delivery; timelines are presented alongside the Gantt chart.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eResource Manager and resource pools\u003c\/strong\u003e — centralise people, equipment, and material resources across multiple .mpp files; identify over-allocations and run leveling to resolve them automatically.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTask Path highlighting\u003c\/strong\u003e — visualise the chain of predecessors and successors for any selected task; the critical path is rendered in red so at-risk work is visible at a glance.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTeam Planner view\u003c\/strong\u003e — a swim-lane view that arranges work by team member, surfaces scheduling conflicts side by side, and lets the project manager drag and drop tasks to rebalance the team.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTimeline bar labels\u003c\/strong\u003e — a Project 2019 addition that shows task progress directly on the Gantt chart, removing the need to switch into a separate view to check status.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eResource capacity heat maps\u003c\/strong\u003e — visualise overallocation, under-utilisation, and bench time across the team in a single colour-coded report.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eSharePoint task list sync\u003c\/strong\u003e — publish project tasks to SharePoint so team members can update progress from a modern browser; changes are pulled back into the master plan.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eAccessibility upgrades\u003c\/strong\u003e — improved keyboard navigation, zoomable reports, and integrated Narrator support make the application more usable for project managers with visual or motor accessibility needs.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eOffice Add-in platform support\u003c\/strong\u003e — read\/write access for Office Add-ins lets custom or third-party tools interact with project data, schedules, and resources.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eWho This Edition Is For\u003c\/h2\u003e\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eProject managers with a deputy\u003c\/strong\u003e who both need Professional-grade resource and reporting tools on a dedicated Windows PC.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eProject leads\u003c\/strong\u003e who alternate between a desktop workstation and a laptop, and need the same Professional capability on both devices.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eSmall PMO teams\u003c\/strong\u003e running a portfolio of related projects that share resources and need consolidated status reporting through SharePoint.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eConsulting and professional services firms\u003c\/strong\u003e that need a perpetual Project Professional license for two members of the team without committing to a Microsoft 365 subscription.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eStandard vs Professional: What Project Adds\u003c\/h2\u003e\n\u003cp\u003eProject Standard is the core project management application: Gantt charts, scheduling, dependencies, milestones, calendars, and built-in reporting. Project Professional adds the features that an organisation needs when it has more than one project running at a time, when it shares resources across teams, or when it wants a tighter collaboration path with SharePoint. The Resource Manager view and the resource pool workflow are the most visible additions, because they let a project manager coordinate shared people and equipment across multiple .mpp files. Team Planner is another Professional-only view, arranging work by team member so that conflicts and over-allocations are easy to see at a glance. SharePoint task list sync, the Office Add-in platform with read\/write access to project data, and the additional Office integration paths round out the collaboration story that the Standard edition does not provide.\u003c\/p\u003e\n\u003cp\u003eFor a single user running a single project, Standard is the right fit and the lower-cost option. For a PMO, a portfolio of related projects, or any team that shares resources across projects, Professional is the typical choice. The perpetual license model means the chosen edition stays available on each activated PC for the lifetime of the installation, with no monthly fees to manage and no auto-renewals to track.\u003c\/p\u003e\n\n\u003ch2\u003eCommon Workflows and Use Cases\u003c\/h2\u003e\n\u003cp\u003e\u003cstrong\u003eSoftware rollout planning.\u003c\/strong\u003e Project managers can use the built-in software rollout template, customise it for the specific release, and assign tasks to engineers, QA, and release managers. The Resource Manager view surfaces overallocation when two engineers are double-booked across the release and the next quarter's maintenance work, and the built-in leveling tool resolves the conflict by shifting the maintenance window. Status updates flow back from team members through the SharePoint task list, so the steering committee can see burndown and earned value analytics through the exported Excel and Power BI reports.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eConstruction and engineering coordination.\u003c\/strong\u003e For a multi-phase construction project, the resource pool holds the contractors, the equipment, and the shared on-site staff. The Team Planner view arranges the schedule by person, so the project manager can see who is on site, who is on the road, and who is overallocated for the week. Task Path highlighting surfaces the critical path, which is essential when a delay in the foundation phase cascades into every subsequent trade. Reporting is exported to PowerPoint for the weekly client update and to Excel for the cost reconciliation that the finance team runs at the end of the month.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eConsulting engagement management.\u003c\/strong\u003e A consulting firm can use a single .mpp file per engagement, with a shared resource pool that holds the partners, the senior consultants, and the staff. The SharePoint task list integration captures timesheets and status updates directly from team members, and the rate tables calculate the engagement margin as work is logged. Inactive tasks let the firm model what-if scenarios for the next quarter's pipeline without disturbing the live engagements.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eMarketing and event delivery.\u003c\/strong\u003e A marketing team running a campaign or an event delivery team running a conference can keep the master Gantt chart in Project and use the timeline view above the Gantt chart to present a clean executive roadmap to stakeholders. The Kanban-style board view (in \u003ca href=\"\/products\/microsoft-project-2021-professional-retail-2-pc\"\u003eProject 2021 Professional\u003c\/a\u003e and later) is the right tool for the daily standup, and the SharePoint task list sync keeps every contributor aligned without requiring them to open Project themselves.\u003c\/p\u003e\n\n\u003ch2\u003eSystem Requirements\u003c\/h2\u003e\n\u003ctable\u003e\n  \u003cthead\u003e\n    \u003ctr\u003e\n\u003cth\u003eComponent\u003c\/th\u003e\n\u003cth\u003eMinimum\u003c\/th\u003e\n\u003cth\u003eRecommended\u003c\/th\u003e\n\u003c\/tr\u003e\n  \u003c\/thead\u003e\n  \u003ctbody\u003e\n    \u003ctr\u003e\n\u003ctd\u003eOperating system\u003c\/td\u003e\n\u003ctd\u003eWindows 10 (32-bit or 64-bit), Windows Server 2016, Windows Server 2019\u003c\/td\u003e\n\u003ctd\u003eWindows 10 or Windows 11 (64-bit) with the latest cumulative updates\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eProcessor\u003c\/td\u003e\n\u003ctd\u003e1.6 GHz or faster, 2-core\u003c\/td\u003e\n\u003ctd\u003e2.0 GHz or faster, multi-core\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eMemory (RAM)\u003c\/td\u003e\n\u003ctd\u003e2 GB (32-bit) or 4 GB (64-bit)\u003c\/td\u003e\n\u003ctd\u003e8 GB for projects with resource pools and large .mpp files\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eHard disk space\u003c\/td\u003e\n\u003ctd\u003e4.0 GB available\u003c\/td\u003e\n\u003ctd\u003eSSD with 8 GB or more free for project files and backups\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eDisplay\u003c\/td\u003e\n\u003ctd\u003e1280 × 768 or higher resolution\u003c\/td\u003e\n\u003ctd\u003e1920 × 1080 or higher with DirectX 10 graphics\u003c\/td\u003e\n\u003c\/tr\u003e\n    \u003ctr\u003e\n\u003ctd\u003eInternet\u003c\/td\u003e\n\u003ctd\u003eRequired for activation, optional for product use\u003c\/td\u003e\n\u003ctd\u003eBroadband for SharePoint sync and Office Add-in marketplace\u003c\/td\u003e\n\u003c\/tr\u003e\n  \u003c\/tbody\u003e\n\u003c\/table\u003e\n\n\u003ch2\u003eActivation and Licensing Notes\u003c\/h2\u003e\n\u003cp\u003eThe 2PC Retail Online key is a perpetual license for Microsoft Project 2019 Professional on two Windows PCs. The key is bound to the installation, not to a Microsoft account. Each PC can be reactivated after a reinstall using the same key. There is no upgrade entitlement: a separate license is required to move to \u003ca href=\"\/products\/microsoft-project-2021-professional-retail-5-pc\"\u003eProject 2021 Professional\u003c\/a\u003e or \u003ca href=\"\/products\/microsoft-project-2024-professional-bind-1-pc\"\u003eProject 2024 Professional\u003c\/a\u003e\u003c\/p\u003e\n\u003cp\u003eProject 2019 Professional is supported on Windows 10 and on Windows 11. It can be installed side by side with the Office 365 apps from a Microsoft 365 plan without conflict, provided the .mpp file association is set explicitly. For organisations that want the same Professional capability on a third device, the 5PC Retail Online variant of Project 2019 Professional is the right step.\u003c\/p\u003e\n\n\u003ch2\u003eGet Started With Microsoft Project 2019 Professional\u003c\/h2\u003e\n\u003cp\u003eDownload the Project 2019 Professional installer from the Microsoft volume licensing center or a trusted source, enter your 2PC product key on each workstation, and follow the activation wizard. The Microsoft Project 2019 Quick Start guide covers the most common project, resource, and reporting workflows. With a perpetual license, your team has Professional-grade project management capability on two Windows PCs for as long as each installation remains in service.\u003c\/p\u003e\u003ch2\u003eMicrosoft Project 2019 Professional Alternatives\u003c\/h2\u003e\n\u003cp\u003eThree credible alternatives cover most project management workloads.\u003c\/p\u003e\n\u003ch3\u003eMicrosoft Project Online (subscription)\u003c\/h3\u003e\u003cp\u003eCloud-based project management with Power BI reporting, resource engagement, and roadmap features. Best fit for organisations already on the Microsoft 365 platform.\u003c\/p\u003e\u003ch3\u003eAsana\u003c\/h3\u003e\u003cp\u003eModern work management platform with portfolios, goals, and timeline views. Strong fit for cross-functional teams that need both project and task tracking.\u003c\/p\u003e\u003ch3\u003eMonday.com or ClickUp\u003c\/h3\u003e\u003cp\u003eHighly configurable work management platforms with Gantt chart views, automations, and integrations. Best fit for teams that want a single tool for projects, tasks, and CRM-style work.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHow to choose:\u003c\/strong\u003e Stay on Project desktop if you need deep resource management, enterprise project types, and integration with the rest of the Microsoft platform. Choose Project Online for cloud access and Power BI reporting. Choose Asana or Monday if you need a flexible work management tool that goes beyond project scheduling.\u003c\/p\u003e\n\n\u003ch2\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eCan the two PCs be in different offices or countries?\u003c\/summary\u003e\n  \u003cp\u003eYes. The 2PC license is counted per device, not per user or per location. As long as the total number of activated PCs does not exceed two, the key can be used across multiple users, sites, and countries.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eWhat happens if I need to replace one of the two PCs?\u003c\/summary\u003e\n  \u003cp\u003eDeactivate the existing installation from inside Project (File \u0026gt; Account \u0026gt; Deactivate) or uninstall the application, then install and reactivate on the new PC using the same key. The activation count is decremented automatically when the deactivation is registered online.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eDoes Project 2019 Professional work with Project Online or Project Server?\u003c\/summary\u003e\n  \u003cp\u003eProject 2019 Professional can connect to Project Server 2019 on premises for centralised resource pools, timesheets, and portfolio analysis. Project Online is now part of Microsoft Planner, Project Online, and the new Project for the web service, and Project 2019 Professional can read and write data through the Project Online Desktop Client add-on when a qualifying subscription is in place.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eIs there a Project 2019 Standard license available for the rest of the team?\u003c\/summary\u003e\n  \u003cp\u003eYes. The \u003ca href=\"\/products\/microsoft-project-2019-standard-retail-5-pc\"\u003eProject 2019 Standard\u003c\/a\u003e 5PC Retail Online license is the right option for team members who only need basic Gantt charts, task lists, and reporting without the resource pool, Team Planner, and SharePoint sync that the Professional edition provides.\u003c\/p\u003e\n\u003c\/details\u003e\n\u003cdetails\u003e\n  \u003csummary\u003eDoes this license include a free upgrade to Project 2021 or 2024?\u003c\/summary\u003e\n  \u003cp\u003eNo. Project 2019 Professional is sold as a perpetual license for that version specifically. To upgrade, a new license for the newer version must be purchased. The .mpp file format remains compatible across releases, so existing plans open directly in Project 2021 or 2024 once the new license is installed.\u003c\/p\u003e\n\u003c\/details\u003e\n\n","brand":"Microsoft","offers":[{"title":"Default Title","offer_id":59850908303441,"sku":"MS-047-MICROSOFT-PROJECT-2019-PROFESSIONAL-RETA","price":9.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1059\/0191\/6241\/files\/microsoft-project-2019-professional-retail-2-pc.webp?v=1784725520","url":"https:\/\/dotkeys.net\/products\/microsoft-project-2019-professional-retail-2-pc","provider":"DotKeys","version":"1.0","type":"link"}